Detailed Description Of The Subject Of The Contract: The Subject Of The Contract Is The Task Under The Name: Reconstruction Of The Multifunctional Field And Construction Of Streetworkout In Chobot Description Of The Subject Of The Contract: Reconstruction Of A Multifunctional Pitch In Chobot In The Niepołomice Commune In The Field Of The Multi -Functional Field With Polyurethane Surface, Installing Devices Above 3M - I.E. 5 M Construction Of Small Architecture Facilities In A Public Place, For Daily Recreation With Technical Infrastructure And Land Development On Plot No. 102/1, 103/1, 103/3, 103/4 In Chobot, Niepołomice Commune. The Project Includes The Reconstruction Of The Sports Field From Asphalt Surface Into A Polyurethane Surface Along With The Installation Of The Ball -Chips And The Installation Of Streetworkout Devices With A Safe Surface For The Needs Of The Local Community In Chobot. The Designed Playground With A Size Of 10.0 X 21.0 M Will Fulfill The Functions Of Playing Pitches:- Basketball Court With Up To 10.0 X 21.00 M;- Volleyball Court With 9.00 X 18.00 M;- Badminton Pitch 6.10 X 13.40 Mworametry Regarding The Surface Of The Pitch: A) Thickness 16-16.5Mm (Min 8+8) B) Extension For Tension: 0.60- 0.80 Mpac) Friction Factor: 0.53 - 0.55D) Extension: 55 - 58 %E) Depreciation At 23? C: 39 - 43 %F) Vertical Deformation At 23? C: 1.0 - 1.4 Mmg) Shock Shock Depreciation At The Laboratory Temperature: 40 - 43 %H) Vertical Deformation: 1.0 1.4 Mmboat Will Be Equipped With Sports And Recreation Devices Such As:- Basketball Kit- Retina Kit- The Badmintonastrefa Workout Set Will Be Equipped With:- Safe Surface With An Area 21.80 M2- 6 Park Benches Will Be Installed At The Pitch. The Plot Is Entirely Fenced. Access To The Pitch Is From The North Existing Exit- According To The Graphic Part Of Pzt. A Detailed Description Of The Subject Of The Contract Is Included In The Design Documentation Covering The Bill Of Quantities And Stwiorb.2) Place Of Order Performance: Chobot 43, 32-007 Zabierzów Bocheński 3) Employment Requirement Based On The Employment Relationship - Requirements Referred To In Art. 95 Pzp.1. Since The Implementation Of This Order Must Be Carried Out By Performing Activities Specified In Art. 22 § 1 Of The Act Of 26 June 1974, The Labor Code - For The Contractor Or Subcontractor, At The Place And Time Indicated By The Contractor Or Subcontractor - The Ordering Party, In Accordance With Art. 95 Para. 1 Of The Public Procurement Law Requires, Employment By The Contractor Or Subcontractor Performing Activities Entering The So -Called Direct Costs Based On An Employment Relationship. This Requirement Applies To People Who Perform Activities Directly Related To The Performance Of Works Covered By The Subject Of The Contract, In Particular In The Field Of General Construction Works. 2 The Method Of Documenting The Employment Of The Persons Referred To In Art. 95 Of The Pzp Act. The Contractor Is Obliged To Submit To The Employer, At
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.