Preparation Of Planning Program, Zoning Plan And Building Plan - New Thirteen Bridge In Øyer Municipality - Step 1 . The Descript Court Bru (Bygd 2012) Collapsed On August 15, 2022. The Bridge Connected East And West Side Of Thirteen Together And Is Part Of Fv. 254. The Bridge Was A Truss Bridge In Steel And Wood. The Main Span Was 70 Meters And In Total The Bridge Was 148 Meters Long With Two Lanes And Sidewalks. Immediately After The Use Collapse, Work Was Initiated To Establish A Temporary Bridge. Temporary Bridge, Emergency Bridge Lent By The Norwegian Public Roads Administration, Came Into Place In The Summer Of 2023. Temporary Bridge Has 10-Year Approval. At The Same Time As Work On Temporary Bridge, Work Was Started On Placement And Bridge Type For A New Permanent Bridge. A Feasibility Study Was First Prepared, Of Which Four Different Placements Were Assessed. Here, A New Bridge Was Adopted Near The Existing Bridge. The Location Then Had To Be Straight Upstream Or Downstream, As The Existing Location Was Seized By The Temporary Bridge. Following The Feasibility Study, A Sketch Project Was Initiated With Cowi As Advisor. The Sketch Project Was A Further Detail In Terms Of The Feasibility Study. The Recommendation From Cowi Was Available In January 2024. The Sketch Project Assessed 3 Different Routes In Connection With Existing Bridge, As Well As 3 Different Types Of Bridge. The Recommendation Was A Steel And Concrete Collaboration Bridge, With Culvert Over The E6. The Recommended Route Was Straight Upstream For The Existing Bridge. The Feasibility Study And The Sketch Project Follow As Annex To The Competitive Basis.
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.