1. In Accordance With The Design Documentation And Technical Specification Of The Implementation And Acceptance Of Works, Modernization Of The Sewage Treatment Plant Together With Launching Should Be Carried Out. 2. Tanks, Settlers, Technical Ladders, Covers Will Be Repaired. - There Is Also A Replacement Of Pipelines, Air Installations, Complete Replacement Of The Control System, All Devices Along With The Power Supply And The Installation Of A New Control Cabinet Instead Of The Existing In The Building Located In The Building3. It Is Required To Arrange A New Wiring Between The Castle Building And The Sewage Treatment Plant. 4 A Complete Replacement Of The Deployment Plot With All Filter Layers Was Planned. 5. The Existing Layers Of The Drainage Plot Should Be Taken And Utilized At The Contractors Expense. 6. In The Reclaimed Area After Excavations, The Area Should Be Smoothed And Sown Grass, Demolished Elements Of The Existing Infrastructure (Path Surface, Curbs, Etc.) Should Be Reproduced. 7. The Modernized Sewage Treatment Plant Should Be Launched And As -Built Documentation Together With The Instructions For Use. 8. The Technical Staff Of The Employer Responsible For The Operation Of The Treatment Plant Should Be Trained
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.