The Subject Of The Contract Is The Performance Of The Order Under The Name Renovation Of Lighting Of The Police Storeman Kwp In Krakow At 109 Mogilska Street . The Scope Of The Order Should Be Completed In Accordance With The Documentation Under The Name Technical Project Modernization Of Lighting Of The Police Standard Of The Kwp In Krakow, At 109 Mogilska Street Inżynierska Inżynierska Grzegorz Mazur Ul. Przemóz 9/4, 30-716 Kraków And Includes The Performance Of: Shooting Hall 1 And Shooting Hall 2A). Removal And Handing Over The Contractors 28 Existing Projectors. Halogen Osq 500W With Omw.B Lenses) Disassembly Of 18 Fuse Luminaires Omegabd/Mb 4X14 Together With Complement The Places After Dismantled Luminaires. To Be Transferred To The Fresh Luminaires Omegabd/Mb 4X14 (Works Changed In Relation To Stwior) D) Dismantling Of 16 Firm Luminaires Omegabd/Mb 4X14 (Works Not Included In Stwior) E) Delivery And Assembly Of Luminaires 16 (Including 5 With The Emergency Module) Of Firm Leds Providing Non-Worse Parameters From Omegabd/Mb Lifts 4X14 In Places Of Disassembly Of Omegabd/Mb 4X14 (Work Not Included In Stwior) F) Dismantling And Handing Over To The Contracting Authority Of The Existing Lighting Control System Of The Shooting Hall According To The Design. Cable Routes For The New Lighting System. Shooters And A Strobe, B) Execution Of The Abovementioned Lighting, C) Execution Of Cable Routes, D) Performing The Supply And Control Wiring, E) Assembly Of The Strobe Lighting Control Console. Note: The Contracting Authority Does Not Provide As Part Of This Contract With The Implementation Of Stage 3 Specified In The Project Documentation. Adventive Obligations Of The Contractor: A) The Contractor Will Transfer The Contracting Program To Controlling The Lighting To The Installed Controllers Together With Configuration Of Lighting Scenes.B) The Contractor Will Perform Measurements Of Anti -Car Protection And Insulation Resistance In The Field Of Built -In Lighting Circuits) The Contractor Will Perform Instructions On The Use Of Devices And The System For A Minimum Of 10 People. The Operation Of The Operation Will Take Place In Krakow, At Ul. Mogilska 109. The Instruction Must Take Place Not Earlier Than After Obtaining Full Efficiency Of The Installed System And Devices Within The Date Agreed In Working Mode, But Not Later Than Before Submitting The Ordering Party To Be Readiness. And Technical Specifications For The Execution And Acceptance Of Construction Works - Annex 8 To Swz, Subject To The Next Sentence. The Bill Of Quantities (Annex 9 To Swz) Only Serves As A Help In Determining The Flat -Rate Amount To Perform The Abovementioned Construction Works. The Quantities Given In This Study Are Approximate And Ancillary. 2) If The Documents Consisting Of The Subject Of The Contract, The Commercial Name Of The Company, Goods Or Product, The Contracting Authority Is Indicated - In Relation To The Parameters Or Data (Technical Or Any Other) Indicated Di
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.