1. The Subject Of The Order Is Construction Of A Water Supply Network In The Lidzbark Commune. 2. The Approximate Total Length Of The Water Supply Network For Designing Is About 8350 M.3. The Scope Of Design Work Includes The Design And Obtaining A Decision On A Building Permit Or Notification Of Construction Works That Do Not Require A Building Permit From The Competent Architectural And Construction Administration Body (For Each Task Separately). Approximate Mileage And Location Of The Water Supply Network, The Scope Of Resistance And The Proposed Diameter Of The Water Supply Network Pipes Are Shown On The Graphic Attachment Entitled The Concept Of Expanding The Distribution Water Supply Network In The City And Commune Of Lidzbark - Constituting Annex 12 To Swz. 4. The Area Covered By The Planned Network And The Description Of Individual Tasks Was Presented, As Well As Described In Detail In The Guidelines For Developing Design Documentation Of The Distribution Water Supply Network And On Maps Made Available In Annex 12 To Swz. The Contracting Authority Has Divided The Studies Into The Following Tasks (Project Documentation, Which Is The Subject Of This Contract, Should Be Completed Separately For Each Of The Tasks Below): I Task - Pn. Construction Of The Distribution Water Supply Network In The Lidzbark Commune - Stage I (Suw Lidzbark - Ul. Dworcowa - Ul. Targowa - Ul. Tartacza - Ul. Zieluńska) Ii Task - Entitled Construction Of The Distribution Water Supply Network In The Lidzbark Commune - Stage Ii (Ul. Targowa - Ul. Słoneczna - Ul. Żeromskiego - Ul. Zieluńska - Ul. Rejtana - Ul. 3 -Go Maja - Ul. Topolowa) Iii Task - Pn. Construction Of The Distribution Water Supply Network In The Lidzbark Commune - Stage Iii (Ul. Rejtana - Ul. Zieluńska - Jamielnik) Iv Task - Entitled Construction Of The District Water Supply Network In The Lidzbark Commune - Stage Iv (Ul. Zieluńska - Jamielnik: Konwaliowa - Piwniczna - Lidzbarska Road To Bryńska - Spink) V Task - Pn. Construction Of The Distribution Water Supply Network In The Lidzbark Commune - Stage V (Bryńsk -Ostro - Clip). Nourse: • Each Task Is To Be Performed In The Form Of A Separate Study. • The Length Of Sections Of The Water Supply Network For Designing Is Orientation Length, It Is Not A Constant Value. 5. The Subject Of The Contract Should Be Developed In Accordance With: A) By The Act Of 7 July 1994 - Construction Law (Journal Of Laws 2012, Item 418) B) By The Regulation Of The Minister Of Development Of 11.09.2020 On The Detailed Scope And Form Of The Construction Project (Journal Of Laws 2012, Item 1670 As Amended) Forms Of Project Documentation, Technical Specification Of Construction And Acceptance Of Construction Works As Well As A Functional And Utility Program.D) By The Act Of 11 September 2019- Public Procurement Law (Journal Of Laws 2019, Item 1320, As Amended) E) By The Regulation Of The Council Of Ministers Of 10.09.2019 On Projects That May Significantly Affect The Environment (Jour
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.