Build According To The Project And Additional Conditions. The Deadline For Carrying Out The Works Is 12.12.2025.1. In The Substation, Replace The Fiddle Protection Switch With A New Xlp With 63A Crops. 2: Mast 23. 3. The Existing Air Is Replaced By Amka 3X70+95 From The Substation To Mastini 20 And The Branch Lines 1 To 9 And The Mast 10 To 30. 4 4. Mainners For Masts 1, 9, 10, 14, 14, 30. 5. 6. Dismantle 20 Consumer Shields From The Mast. Replace The Markings According To Standardelenb! Please Pay Attention To The Document P135 Electrical Institutional Construction Construction Contract, Which Came Into Force On 18.06.2024.