Tenders Are Invited For Execution In The Formula Design And Build Tasks Entitled: Construction Of The Expansion Tank (Two -Chamber) Drinking Water Along With The Necessary Infrastructure In Stryszawa, The Commune Of Stryszawa
Tenders Are Invited For Execution In The Formula Design And Build Tasks Entitled: Construction Of The Expansion Tank (Two -Chamber) Drinking Water Along With The Necessary Infrastructure In Stryszawa, The Commune Of Stryszawa
1. The Subject Of The Contract Is The Design And Implementation Of The Expansion Tank (Two -Chamber) Of Drinking Water Together With The Necessary Infrastructure In Stryszawa, The Stryszawa Commune. 2. The Scope Of Works Includes In Particular The Development Of Project Documentation And Execution Of Construction Works: • Two Chambers Of The Drinking Water Expansion Tank, • Tank Gate Chambers, • Water Disinfectants, • Construction Of A Water Reservoir Station Worn Out, • External Installations): Water And Control Water And Trigger, • Internal Installations And Devices: Technological, Water, Sewage, Heating, Ventilation, Energy And Control Of The Water Reservoir Parameters And The Valley Of The Gateway: The Active Capacity Of The Chambers In Total Min. Water Disinfection: Building Surface Min. 7M2 Parameters Of Used Water Tank: Capacity 10 M3 Parameters Of The Water Supply Network And External Water Supply Installations: Water Pipelines With A Diameter Of 160Mm In Diameter With A Length Of About 50M, The Pe Material Of The Pep Installation Of The Overflow System: Sewage Pipeline With A Diameter Of 160Mm In Diameter, Pvc Parameters Of Internal Installations (Reservoir, Chamber Of The Gate And Disinfection Station): Water Pipelines With A Diameter From 100 To 150Mm, Material Stainless Steel Aisi 304, Set The Order Includes In Particular: • Obtaining Excerpts From The Land Register For All Investment Plots, • Making A Map For Design Purposes Together With Obtaining A Clause, • Preparing Geotechnical Documentation, • Performance Of A Water -Legal Report And Obtaining A Water Permit For The Discharge Of Collected And Unused Water - If Necessary, • Drawing Up A Concept, • Preparation Of A Construction Project - Obtaining All Necessary Conditions, Opinions, Arrangements And Decisions Required By Law To The Developed Construction Project, The Agreement And Decisions Will Be Obtained By The Contractor On Behalf Of The Ordering Party And On His Behalf, • Obtaining A Final Building Permit Decision On Behalf Of The Ordering Party And For Him, • Preparation Of An Executive Project, • Geodetic And Geological Service Of Works, • Construction And Assembly Based On The Developed And Approved Project, • Supply Of Materials And Equipment Based On The Developed And Approved Project, • Providing A Set Of Markings, User Manuals, Health And Safety Instructions And Fire Protection, Required By Detailed Provisions For Proper Operation Of Designed And Completed Objects, • Conducting Required Tests And Tests, Fire, • Fees For Foreign Supervision Necessary During The Implementation Of Works, • Obtaining A Permit For Use Or Making An Effective Notification Of The Building Supervision Authority About The Completion Of Construction (Effective Notification Is Understood As A Notification, In Relation To Which The Building Supervisory Authority Did Not Raise An Objection By Way Of A Decision), Where The Contractor Is Responsible For The Selection Of The Appropriate Administrative
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.