3 Walls Of General Sikorski 8 In Toruń ”2. Guidelines For The Implementation Of The Subject Of The Contract: 1) The Creation Of Temporary Shelter Should Be Provided In The Rooms Of The Underground Floor. 2025 Item 932). The Subject Of The Contract Should Be Met At Least, Specified In Art. Information And Communication Availability, Including In Particular To Include The Installation Of Devices Or Other Technical Means Of The Service Of Hearing Persons. In The Event Of The Ability To Ensure The Solutions Indicated Above For Reasons. Proposals Together With Justification). The Possibilities Of Transforming The Underground Floor Of The Namiejsca Ad Hood. Studies, 3. Also In The Electronic Version In Pdf, Doc, Dwg (Written In The Autocad2008 Version). 4. The Extent Necessary To Perform The Concept, Including Electrical, Teletechnical And Sanitary Installations, 5) Transfer To The Contracting Authority Of Property Rights To Completed The Contract In The Scope Of The Contract. 5. The Contractor Is A Detailed Description Of The Subject Of The Contract. As Non-Compliance With The Content Of Swz.9. Orders From The Subsidy The Task Must Be Completed Within The Deadline By The Day Resulting From The Decision Point 9 And The Execution Of The Subject Of The Ordered Of This Date Loses Its Significance For The Contracting Authority (Article 492 Sentence 2 Of The Civil Code). The Period Strictly Specified Above.
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.