Build According To The Project And Additional Conditions. The Deadline For Carrying Out The Works Is 05.12.2025.F3 Replacement Of The Bare Cord: 1. Replace The Existing Oil From The Substation To M14 Amka 3X70+95. 2: Replace The Old Fimb Xlp At The Substation Against The Abb Xlp, The Base 160A, The Protection 32A. 3. Install On Masts 1, 2, 3, 5, 10 Grounding, F1 Bare Cord Replacement: 1. Replace The Existing Oil Visanges Of The Substation And M27 Between Amka 3X70+95. 2: Replace The Old Fimb Xlp At The Substation Against The Abb Xlp, The Base 160A, The Protection 32A. 3. Install On Masts 1, 4, 8, 13, 18, 23, 27.Nb! Please Pay Attention To The Document P135 P135 Electrical Institutional Construction Construction Contract, Which Came Into Force On 18.06.2024.
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.