1. The Subject Of The Order Is The Implementation Of The Task Entitled: Thermomodernization Of The Zs Building In Dzikowiec. The Scope Of Work Includes The Comprehensive Thermomodernization Of The Building Of The School Complex Father Monsignor Stanisław Sudoł Located At Ul. Szkolna 17, 36-122 Dzikowiec, Consisting Of Performing Construction And Installation Works In The Following Range: 1) Construction And Intermoma-Modernization Works: • Insulation Of The External Walls Of The Building Below The Ground Level (To The Level Of Foundation), • Insulation Of External Walls Of The Building Above The Ground Level, • Insulation Of The Ceiling Under An Unheated Attic, • Exchange Of Window, • Replacement Of External Doors. Art. 3) Installation Of Renewable Energy Sources (Renewable Energy): • Execution Of A 40 Kw Solar Installation, • Assembly Of 10 Kw Electricity Warehouse And A Capacity Of 20 Kwh.4) Modernization Of Lighting: • Replacement Of Lighting For Led Energy -Saving Light - 518 Pieces 5) Purchase Of Equipment: • Purchase Of A Portable Charger For Electric Vehicles (1 Pcs. Local Renewable Energy Source. Agreement Of The Geodetic Inventory Of The As -Built The Subject Of The Contract And Transferring It To The Employer In 2 Copies In Paper, D) Devices, Development And Protection Of The Construction And Works And Maintenance Of The Abovementioned Ingredients In Proper State, Including The Protection Of The Works Area Against Access By Bystanders, The Implementation And Maintenance Of The Fence Of The Works Area, Temporary Roads, Travel And Ensuring The Supervision Of Construction, E) Organizing The Area Adjacent To The Area Of Works, F) Organizing Work While Maintaining Health And Safety Conditions Specified In Detailed Provisions, G) Persons Staying On The Construction Site From The Contractor Or Subcontractor Implementing Robots/Works At The Construction Site Will Have Identifiers That Allow You To Verify The Company Of The Contractor Or Subcontractors, E.G. Warning Vests With The Company Name, H) Submitting The Termination Of Completion Of Construction Works; I) Participating In The Process Of Receiving The Object, J) Preparation Of The Final Settlement And Drawing Up A 1 Copy Of The Collaboration Unit, Which Is To Conclude The Contract, Offer, Offer, Offer Detailed Contracts With Possible Subcontractors, Schedule, Reporting Of The Construction Area, Covered Works Protocols, Material Research, Approvals, Geodetic Report Together With Confirmation Of The Submission Of Geodetic And Cartographic Documentation At The Center, Financial Settlement, As -Built Cost Estimates, Notification Of Completion Of Works And Notification For The Acceptance Of The Task, Declarations Of Cultivated Work Managers .2. A Detailed Scope And Manner Of Execution Of Works Is Determined By: 1) Specification Of The Terms Of The Contract; 2) An Audit Of Energy Efficiency; 3) Design Documentation; 4) Issues Of Works That Are Only An Auxiliary Document; 5) Formal And Legal D
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.