1. The Subject Of The Contract Is, The Execution Of Construction Works Consisting In The Replacement Of Windows And Doors In The External Walls And The Renovation Of The Building Of The Senior House In Łysaków. The Wall Of The Walls, · The Thermal Insulation Of The Ceilings Under The Attic, · The Thermal Insulation Of The Walls Between The Attic And Non-Usable. Sheet Metal Processes, · Covering The Facade With Silicate-Silicone Plaster, Construction Of Plinths From Quartz Facade Panels, Making New Polystyrene Cornices, · Insulation Of Chimneys, Chimney Fittings With Steel Sheet Metal, New Stainless Steel Ventilation Grilles, · Modernization Of Heating And Preparing Hot Water Installations. Heat Pumps/Water With A Power Of 22 - 35 Kw, Water Storage, A Diaphragm With A Safety Group, Control, Hydraulic And Electrical Components. Module 480 Wp, Module Efficiency 22 %, Along With A 20 Kwhera Energy Warehouse. Expansion, Superstructure And Reconstruction Of The Tso Service Building In Czermina With Internal Installations And Reconstruction Of The Gas Connection. Establish Styrofoam 17 Cm Thick And Heat Conduction Coefficient Λ = 0.038 W/Mk,- Insulation Of The External Walls Of The Garage Parts With A Thickness Of 17 Cm And Λ = 0.038 W/Mk,- Insulation Of Previously Insulated Walls With An Additional Layer Of Polystyrene With A Thickness Of 12 Cm And Λ = 0.038 W/Mk, · Ceiling Insulation Under Unheated Attic:- Styrofoam Or Mineral Wool 22 Cm Thick And Heat Conduction Coefficient Λ = 0.035 W/Mk, · Foundation Wall Insulation:- Necessary Work Related To Waterproofing (Frozing, Supplementing The Inequality With Renovation Plaster),- Waterproofing- 2X Dysperbite Or Equivalent, And Heat Conduction Coefficient Λ = 0.038 W/Mk, · Working Replacement:- Replacement Of Windows With New Heat Transfer Coefficient U = 0.9 W/M²k,- Replacement Of Garage Windows With New Ones With A Heat Transfer Coefficient U = 1.4 W/M²k,- Replacement Of External Doors And Garage Gates With New Heat Penetration Coefficient U = 1.3 W/M², Modernization Of The Heating System:- Installation Of The New Heat Pump Air/Water With A Capacity Of 50-65 Kw With Equipment, Automation And Energy Management System,- Replacement And Assembly Of New Radiators And Thermostatic Valves,- Installation Of Cables, Thermal Insulation And The System Of Monitoring Energy Consumption, · Modernization Of The Warm Water Water System: · Installation Of The Air-Conditioning Installations With A Capacity Of Approx. 6 X X 2.7Kw, 4 X 5.2 Kw,- Converting A Gas Source Into A Compressor Heat Pump Air/Electric Powered Water, · Facade Renovation, · Installation Of Photovoltaic Installations:- System Power Approx. 20 Kwp,- Installation Cooperating With A 20 Kwh Energy Magazine, · Installation Of The System Monitoring System, · Installation Split Air Conditioning Devices In Offices (3 Pieces With A Capacity Of 2.7 Kw And 5.2 Kw),- Replacement Of Air Conditioning In The Room On The First Floor: 2 × Multi -Plit Air Conditioner (