4.1. The Subject Of The Order Are Construction Works On The Investment Task Entitled: Modernization Of The Place Of Integration Of The Local Village Common Room In Celinów, The Dębe Wielkie Commune. The Material Scope Includes, In Particular: 1) The Performance Of Demolition Works Of The Existing Roof Covering And Structure, Truss Housings, Existing Roofing Above The Entrance With A Supporting Structure And A Barrier, Dismantling Of The External External Lighting Lamp, Dismantling Of Flashings, Dismantling Of External Sub -Chain, Disassembly Of External Entrance Doors Together With The Costs Of Export And Utilization; 2). Replacement Of The Oblique Roofing Along With The Construction Of The Roof Truss Of The Wooden Structure (Wooden Girders With Muffin) - 99.3 M2: A). Picking Up The Peak Walls To Adapt The Height Of The Walls To New Roof Trusses; B) Mounting The Roof Covering Of The Roofing Of The Metal Roofing In Brown Roofing Tins With Felt; C) Installation Of Flashings With Guttering; D) Mineral Wool Insulation 25 Cm; E) Vapor Barrier Foil; F) Double Suspended Ceiling (Gkf X 2) On A Steel Profile Frame; G) Internal Finishing Works; 3) Renovation Of Two Chimneys - 2 Set; 4) Replacement Of The Roof Above The Entrance - Roof Tiles And New Wooden Structure Of The Roof Roof - 9.5 M2; 5) Replacement Of A Flat Roofing With Polystyrene Cover - 130.5 M2: A) Removal Of The Existing Felt Cover For Concrete Together With The Export And Utilization Of Waste B) Local Repairs And Soil Leveling; C) Arranging The Polystyrene Gr. 25 Cm With Mounting To The Ground; D) Single Coverage With Welded Roofing Felt; E) Installation Of Flashings Along With Guttering; 6) Thermomodernization Of The Walls Above The Plinth With Polystyrene. 20 Cm With The Facade (System Plaster) - 220 M2; 7) Excavating Foundation Walls - 60 M3; 8) Antiwilgic Insulation Of Foundation Walls - 80 M2; 9) Insulation Of The Walls Below The Plinth And Foundation Walls With Styrodure Thickness 15 Cm With Mosaic Plaster Over The Ground Level - 80 M2; 10) A Thin -Layer Expedition From Mosaic Plaster. 11) Replacement Of Existing Front Door With New External Aluminum Doors With A Width In The Light Of 90Cm. Heights In The Light Of The 200Cm Transition, Brown Together With The Necessary Widening Of The 2.205 M2 Hole; 12) Delivery And Assembly Of The External Led Lighting Lamp At The Entrance To The Common Room Building - 1 Set; 13) Execution Of A Band Width 50 Cm - 30 M2.14) The Warming Should Be Made Using Construction Materials Allowed For Market And Using A Ready -Made Insulation System Selected Manufacturer.
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.