Part No. 1 - Service Of The Thermal System In The Airport Complex In The Malbork Kingdom. The Subject Of The Order In Part 1 Is The Support Of The Thermal System Consisting In Performing Activities And Current And Maintenance -Transparency On The System In Such A Way That It Is Entirely Technically Functional. 3 884 Kw.B) Electric Boiler Rooms - 6 90 Kw Electric Boiler Rooms Work In The System) Networks And Heating Connections Made In Pre -Izulated Technology With A Length Of 1 421 Mb.D) C.O. And Hot Water In 23 Buildings With A Total Heated Surface Of 27,364 M2, Including 3 Hangar Buildings With An Area Of 17 133 M2 Heated In The Central Heating Mixed System. And Blow-In-Vaspberry.E) Networks And Gas Connections, Made Of Polyolefin, Low Pressure With A Reduction And Measuring Point, Gas Installations In 5 Buildings Made Of Polyolefin.
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.