Construction Work-N8 / Lungern Nord-Giswil Süd: Building Bsa 011 Hs Systems. The Bsa Los 011 Hs Systems Includes Services For Engineering, Delivery, Assembly And Commissioning Of The Advertised Hs Systems (Non -Binding Numbers, Not Final): - Implementation Pgv Up To The Approval By The Esti Including Creation Of All The Required Documents/Form - Lead Coordination With L012 Hs Control And Integration In Control Technology - Delivery/Installation/Installation/Ibs Hs Switchgear Including Secondary And Protection Technology (25 Pieces)-Delivery/Installation/Ibs Transformers (10 Pieces)-Delivery/Installation/Installation/Ibs Hs Cable (2200 M)-Delivery/Installation/Connection/Ibs Ns Cable From Transformer To Ns Hv In General (400 M)-Delivery/Connection/Ibs Ns Cable From Transformer To Ns-Hv (400 M) - Delivery/Installation/Connection/Ibs Ns Cable From Transformer To Sgk Av (200 M) - Delivery/Installation/Connection To Ground System Transformer And Hs Room - Delivery/Installation 6 Serer Pipe Block Sisto Incl. Assembly Device (1800 M) - Delivery/Ibs Pressure Relief Valve (Installation In L083) (4 Pc.) The Scope Of Services Includes In Further: - Project Management (On The Part Of The Company) - Mass -Recording And Checking On The Construction - Work Planning (Including Creation Of Realization Obligation Rph With Interface Adjustment) - Entering And Setting Up Work Tests - Submission - Ready To Use - Ready -To -Operate - Trial - Creation Of The Carried Out Work (Daw) And Training - Maintenance And Maintenance
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.