Architectural, Construction, Engineering And Inspection Services - Framework Agreement For Study Services In The Context Of The Renewal Of The Viaduct Van Wilrijk (A12). The Services Include The Provision Of Project Guidance And Study Support That Are Necessary For Renewing The Viaduct Van Wilrijk, Located On The A12, South Of Jan De Vostunnel And To The North Of Aartselaar And Can Include: The Study And Design For Infrastructure Projects (Incl. Sewer) In The Broadest Sense,… The Study Of The Eia And,,,,,,,,,,,,,,,,,,,, To The Desipt,,,, To The Eias,,, To The Eia-Disciplines, And The Eia-Disciplines And Desprieci, And The Desipd,, And The Desiliin Desprieci, And The Eia-Disciplines And Desprieci-Despipins, And The Eia-Disciplines And The Does-Desip,,,,,,,,,,,,,,,,-De-Sewage---Old--Ings-Classified--Sed--Class--S---Class-Edged--Ings--Class--S Artworks, Including The Guidance In The Context Of Prior Investigations The Study Of A Cathodic Protection System For The Viaduct Van Wilrijk, Including Investigations, Tests, Comparative Studies, Providing Input For An Implementation Specifications (Technical Provisions, Plans, Measurement State, Etc.), Etc. Format Start And Project Memorandum And Evaluatienota Formatting Project-Mererded Plans Environmental Permit Application For The Guidance Of Tendering Procedure And Elaboration Of Detailed Procurement Documents (Bim Model, Plans, Cutlery, Measurement And Detailed Estimate) Assignment From Project Communication Participation With Local Stakeers To Arrive At A Behaved Design Bim Instead Of Information Management Organizing And Implementing Testing Program. Investigations Of The Integration Of The Tram Expansion Project Antwerp - Corridor Wilrijk - Uza, Both In The Zone Of The Viaduct, And In The Zone North Of The Viaduct (Zone Between Viaduct And Beginning Jan Van Rijswijklaan And Jan Devoslei) Further Elaboration Of The Raped Unique Of The Newly Deposited Of The, Whereby, The New -Tunnels, Whereby, Whereby The Tunnel Tunnel Tunnel Tunnel Tunnel Tunnel, The Tunnel Tunnel Tunnel Tunnel Tunnel, Proposed Connection (An N177 To Jdvt And Vice Versa) Must Be Considered A Precondition. For A Detailed Description Of The Object Of The Assignment, Reference Is Made To The Technical Provisions. Because Of The Complexity Of The Assignment And The Large Group Of Stakeholders And Policy Factors Involved, The Intendant - Appointed By The Future Association - Is Responsible For Stakeholder Management With Organized Stakeholders On The Basis Of Workbenches And Sounding Board Groups. Complementary To The Assignment Of This Intendant, The Contractor Is Responsible For Organizing Participation With Local Actors Such As Citizens, Local Associations, Schools, Etc. Within This Framework Contract, Specific Profiles Are Asked That Must Be Able To Perform The Tasks Above. For A Detailed Description Of These Profiles, Reference Is Made To The Technical Provisions. With Regard To The Size Of The Framework Contract, An Estimate Was Made For The Budget For The Realization Of These Services For The Coming Years. However, This Fact Is Only In The Indicative Title And Can Always Change And Grant No Rights Or Minimum Decrease To The Service Provider. The First Objective Is To Be Able To Start 2026 In Spring