Test Drilling And Bling Work - Geothermal Drilling And Well -Testing Work Ism.. Geothermal Drilling And Well -Testing Work Records That The Kbt. In Accordance With The Interpretive Provision Pursuant To Article 3, The Total Amount Set In The Km Is The Amount Of The Framework Agreement, Which Is A Net Of 7,860 000 000 Huf. The Total Length Of Drilling Is Planned: 7000 (2X3500 Fm Deep) River Meters Ak A Kbt. In Order To Comply With Article 65 (3) And (5), And In Accordance With Article R. 21 Para. Staff, Tools, Equipment And Materials. The Drilling Contractor Must Carry Out The Work On The Basis Of A Comprehensive Drilling Plan Provided By The Customer, Which Will Result In Safe And Timely Wells In Accordance With The Requirements Of The Project, All Within A Key Design And Construction Contract. The Entrepreneur Must Provide, Among Other Things, The Following: Drilling Equipment With All Additional Equipment And Staff Drilling (Drill Pipe, Aggravation, Etc.), Holey Fittings And Rescue Equipment Required For Directed Skewed Tool Liner Pipes And The Necessary Additional Equipment Well Head Fittings Geophysical Gauge Service Wells Service And Necessary Equipment Ebk Fuel Drilling Water Supply Material Storage Guarding And Deep Drilling Vertical Depth Of Deep Drill 3,500 M Tvd, According To The Actual Location Of Good Water-Water Cracks At Drilling. The Contracting Authority Intends To Conclude The Framework Agreement Of The Kbt. 105 (2) (C). Km2 Competition Will Be Re -Established. Ak Intends To Conclude The Framework Agreement With 3 Tenderers. More Details In Public Procurement Documents.
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.