Tenders Are Invited For Construction Work - Engineering - Design, Author Supervision And Ctp For The Site: Major Overhaul Of The Eastern Sidewalk On Bulgaria Blvd. With The Separation Of Parking Spaces Between Fr. 670-671-672-673A Harmanli.
Tenders Are Invited For Construction Work - Engineering - Design, Author Supervision And Ctp For The Site: Major Overhaul Of The Eastern Sidewalk On Bulgaria Blvd. With The Separation Of Parking Spaces Between Fr. 670-671-672-673A Harmanli.
Construction Work - Engineering - Design, Author Supervision And Ctp For The Site: Major Overhaul Of The Eastern Sidewalk On Bulgaria Blvd. With The Separation Of Parking Spaces Between Fr. 670-671-672-673A Harmanli.. Short Description Of The Activity In The Scope Of The Contract: 1. Design 4.2. Construction Works (Construction Works) 4.3. A Copyright Supervision Has Been Drawn Up A Technical Specification And The Participants Should Prepare Their Offers According To It. 5. Deadline Of Execution Of The Contract: The Contracting Authority Determines The Maximum Permissible Time Limit For The Execution Of The Contract Up To 90 Calendar Days, Of Which Up To 20 Calendar Days For The Production Of An Investment Project In Phase Technical And Up To 70 Calendar Days For The Execution Of The Construction Works. The Deadlines For Implementation Of The Activities Are At The Proposal Of The Participant. The Deadlines Offered By The Participants Should Not Be Outside The Maximum Deadlines Specified By The Contracting Authority. In The Event Of A Discrepancy Of Any Of The Deadlines Specified By The Contracting Authority, The Tender Of The Participant Will Be Eliminated From Further Participation In The Procedure. 5.1. The Deadline For Developing An Investment Project In A Phase Is Technically Starting From The Date Of Receipt Of A Contract For The Start Of The Activity For The Preparation Of A Technical Project By The Contracting Authority And Is Until The Submission Of The Prepared Draft By The Contractor With The Acceptance And Delivery Protocol. The Deadline For Preparation Of The Project Does Not Include The Time For Coordination Of The Prepared Project With The Competent Authorities/Persons And Operating Companies, As Well As All Other Coordination Deadlines. 5.2. The Deadline For Implementation Of The Construction Works Begins To Run From The Date Of Signing A Protocol For The Opening Of A Construction Site And Determination Of The Construction Line And Level (Annex 2 To Article 7, Paragraph 3, Item 2 Of Ordinance No. 3/31.07.2003 On Drawing Up Acts And Protocols During The Construction No. 3/31.07.2001 On The Drafting Of Acts And Protocols). 5.3. Deadline For Exercising Copyright Supervision - From The Signing Of A Protocol For The Opening Of A Construction Site And The Determination Of The Construction Line And Level (Annex No. 2 To Article 7, Paragraph 3, Item 2 Of Ordinance No. 3/31.07.2003. 3/31.07.2001 The Proposed Deadlines Should Be In Terms Of Numbers. 1 500.00 Bgn Without Vat.
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.