Sports Hall Construction Work- New Construction Of A Four-Time Sports Hall, Installed Festivals. The Structure With The Dimensions Of Approx. 46 M X 30 M Consists Of Two Floors With Partial Basement And Reaches A Building Height Of Over 14 M Above Grounds. Description Of The Essential Services: Hall Og 2 St. 4-Fold Sleeve Furnishings 4 St. Floor Hooks For Clamping Top Bars 1 St. Multi-Tischeukel-Einatung 1 St. Climbing Speed 2 St. Sprout Wall Furnishings 1 St. Basketball Ceiling Scaffolding 7 St. Basketball Wall Scaffold 3 St. Volleyball Facility 3 St. Badminton Facility, 3-Subject Field 1 St. Handball Facility Hall Ug 1 St. Multichelickel-Sprossenwand Device 4 St. Basketball-Gurdy Training Systems 1 St. Volleyball-Ball Facility 1 St. Boulder Wand, 2.8 X 12.0 M Dressing Rooms Eg 98M Cloakroom Seat, Wall Assembly 108M Cloak Hook Strips, Wall Assembly
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.