1. The Subject Of The Contract Are Construction Works As Part Of The Task Entitled: Modernization Of Buildings Of The Primary School In Błędów. 2. Part I: Reconstruction And Renovation Of The Roof Part And Entrance Stairs Of The Primary School Building In Będów. The Scope Of Work Includes In Particular:- Demolition Of The Roofing Over The Asbesto-Cement School And Their Utilization,- Demolition Of The Roofing Over The Former Gym From The Corrugated Metal,- Demolition Of Existing Flashings,- Demolition Of Free-Standing Chimneys,- Replacement Of Damaged Roof Truss Elements,- Dismantling Of The District Installation,- Demolition Of The District Installation,- Demolition Of The District Installation,- Demolition Of The District Installation,- Demolition Of The District Installation,- Demolition Of The District Installation,- Demolition Of The District Installation,- Demolition Of The District Installation,- Demolition Of The District Installation,- Demolition Of The District Installation,- Demolition Of Stairs Input,- Demolition Of The Pavement,- Reinforced Concrete Works,- Making A New Roof Covering From The Tile Sheet Metal Like,- Performing New Flashings,- Assembly Of Gutters And Drop Pipes,- Execution Of New Chimneys,- Insulation Of The Ceiling,- Assembly Of Roof Hatches,- Installation Of Snow Fences,- Assembly Of The Hoods,- Assembly Of The Hoods,- Assembly Of Steel Door, Thermal Insulation Of The Mineral Wool Of The Attic Ceiling,- Execution Of A New Lightning Protection System,- Attic Lighting,- Making New Stairs With External Wipers, Integration Plates And Handles,- Performance Of A New Pavement,- Accompanying Works Also Accompanied Required Tests, Tests And Checks3. A Detailed Description Of The Subject Of The Contract Was Specified In The Attachments To Swz: A) Annex 10 To Swz - Technical Specifications For The Execution And Acceptance Of Construction Works (Hereinafter: Stwiorb), With The Proviso That In A Situation Where The Provisions Of The Contract Specify The Manner Of Conducting Works Or Acceptance Or Settlement Of Works In A Different Way From Stwiorb, The Provisions Of The Contract Are Binding, B) Annex 11 Rubs, C) Annex 12 To Swz - Design Documentation, Including Technical Projects, Construction Project, Plot Development Project 4. Warranty: 4.1. The Length Of The Quality Guarantee Period For Completed Construction Works And The Supplied And Built -In Materials Is Min. 36 Months From The Date Of Signing The Final Acceptance Protocol And Is A Criterion For Assessing Offers. 4.2. The Contracting Authority Defines It For A Period In The Range From 36 Months (Minimum Date) To 60 Months (Maximum Date). 4.3. The Contractor Is Responsible For The Warranty For Physical Defects On The Principles Set Out In § 11 Of The Draft Contract Of Annex 5 To Swz.