GTR 101389007

Tenders Are Invited For Networks - Separation Of Network Services

ICB — International Competitive Bid Closed central europe
Tender Information
GTR Reference
101389007
Tendering Authority
Subscribe to view
Tender No
577487-2025
Financer Name
Self-Funded
Work Title
Tenders Are Invited For Networks - Separation Of Network Services
Bid Type
ICB — International Competitive Bid
Country
Subscribe to view
Geographical Region
central europe
Political Region
European Union
Last Date of Bid Submission
03-10-2025 Closed
Work Detail
Networks - Separation Of Network Services. Task Mavir Zrt. Separation Of Services From The National Telecommunications Backbone Network. The Solution Ensures The Easier Handling Of The Assets Of The Subsequent Company And The Independence Of The Entire Network, And The Services Will Be Operated As A Homogeneous Platform. Thereby Further Increasing The Reliability Of The Services. These Planned Transfers Do Not Affect Continuous Business. Service Separation For The Network, Between The Budapest Stations (Mvmcs-Göd-Zugló) Is The Task Of Developing A Ring Topology Foadm-Based Wdm Transport Network. The Budapest Stations Are Completely Independent Of The Current Huawei N1 And N2 Networks As A Dc Network. New Wdml Trunk Requires: • Budapest N1: Mvmcs_N1_Y_Xxx - God4_N1_Y_Xxx: ~ 27Km Mvmcs_N1_Y_Xxx - Zuglo2_N1_Y_Xxx: ~ 20Km God4_N1_Y_Xxx - Zuglo2_N1_Y_Xxx: ~ 23Km Service Separation -Related Tasks The Number Of Services To Be Met: A. 10Pcs 16Gb Fiber Channel, B. 4Pcs 8Gb Fiber Channel, C. 8Pcs 10G And 2Pcs 1G Rented Lines. Task Mavir Zrt. Services On The Current Nokia Wdm National Telecommunication Spine Network, And Installing New Huawei Wdm Devices, Installation And Measurement Tasks: 1. Huawei Wdm Installation: A. Transportation Of Tools To Location, Logistics Tasks. B. Huawei Device Installation In The Rack Cabinet. C. Wiring Wiring Between Pdu And Node Is Required To Develop Node Dual Power Supply. D. Inner Optical Cabling Within The Equipment. E. Line Side Optical Wiring Between Director Odf And Node. F. Labeling Devices And Cables. G. Training: 1 Time, Up To 2 Days (Up To 2X8 Hours) Attendance Education For Installed Devices (Operation, Configuration And Troubleshooting). 2. Preparation Of Client Optical Cables (Installation And Labeling Optical Cables) According To The Types Of Service To Be Migrated. 3. Huawei Wdm Equipment Deployment: A. Configuring Devices And Inserting The Network (Nce). B. Tools Software Upgrade To Do It If You Need It. C. Management And Uploading Licenses. 4. Perform Measurements And Tests After Commissioning Devices: 8Gfc, 16Gfc And 10G, Optical Measurement, Etc. 5. Transfer Of Services To Be Met By Daytime Work. On -Site Contribution To Work At Several Locations During Migration. Migration Of Services To Previously Prepared Ports, If Necessary Measurements, Contribution To Troubleshooting. The Work Must Be Carried Out On A Critical Or Priority System. 6. Participation On On -Site Tour If Necessary. Documentation Tasks: 1. Making Photos Of Work And Their Results, Grouped According To Locations And Occasions. 2. Installation And Implementation Documentation Or Where Necessary Measurement Note
Key Value
Tender Value
Ref. Document
Tender Documents
Global Tender Document
66c726e1-6905-4e50-b7bf-03301d0a866b.html
Attachments
Additional Details Available on Click
  • Tendering Authority
  • Publication Document (Tender Document / Tender Notice)
Disclaimer

We take all possible care for accurate & authentic tender information. However, users are requested to refer to the original Tender Notice / Tender Document published by the Tender Issuing Agency before taking any decision regarding this tender.

Tell us about your Product / Services,

We will Find Tenders for you

TenderDetail
Loading tenders