Tenders Are Invited For Construction Of An External Elevator At A Public Facility In Dąbrowa Górnicza At Kardynała Stefana Wyszyńskiego 1 As Part Of The Task: Replacement Of A Crane Platform With A Passenger Crane
Tenders Are Invited For Construction Of An External Elevator At A Public Facility In Dąbrowa Górnicza At Kardynała Stefana Wyszyńskiego 1 As Part Of The Task: Replacement Of A Crane Platform With A Passenger Crane
1.1 The Subject Of The Contract Is The Implementation Of Project Documentation, Disassembly Of A Personal Platform, Construction Of An External Reinforced Concrete Elevator And Foundation, Delivery And Installation Of A Passenger Elevator With Electric Drive (Adapted For Transporting People With Incompatibility) And Performing Accompanying Construction Works On A Public Building In Dąbrowa Górnicza In The System In The System Design And Build Functional And Utility (Pfu). The Order Of The Contract Will Be Implemented In Accordance With The Stages: I. State- Development Of The Agreed Full Design (Multi-Branch) Documentation, Including The Technical Specifications Of The Performance And Acceptance Of Construction And Executive Works Containing All Calculations With Architectural Details, And Preparing And Obtaining Necessary Consents To The Location Of The Elevator, Submitting An Application For Building Permit. The Second Stage- The Start Of Construction Works Will Take Place After The Design Documentation Is Approved And The Building Permit Is Obtained. Execution Of Preparatory Works, Fencing The Area And Preparation Of The Construction Site And Construction Facilities, The Implementation Of Demolition Works As Well As The Export And Disposal Of Materials, As Well As Scrapping, Excavations For Foundations Together With The Stabilization Of The Substrate Under The Foundation And Tests Of The Degree Of Soil Compaction. 1.2 The Contractor With Scrapping The Passenger Platform And All Components And Accessories At The Next Score Indicated By The One Indicated By The One Indicated By Ordering Party. The Contracting Authority Will Participate In The Dismantling Process. The Contractor Will Inform The Employer By E-Mail About The Demolition Date 5 Days Earlier. The Contractor Will Dismantle And Take The Elements To The Scrapping Point At His Own Expense. The Scrap Metal Is The Property Of The Municipal Board Of Residential Buildings. 2.2 Foundation Of The Elevator Shaft, Foundation Slab Collection, Elevator Of The Elevator Shaft In The Prefabricated Structure Breathed From The Object, Performing The Acceptance Of Works Of Disappearing And Covers (Vision Of Facade And Facade). External Electric For The Needs Of The Operation And Service Of A Passenger Elevator, Performing All Necessary Tests, Tests And Measurements. Elevator Start, Udt Acceptance, Obtaining A Final Use Permit. 4.2 During The Contractor Conducting Construction And Assembly Works, The Employer Will Receive Works Disappearing By Subject To Coverage And Will Receive Final Acceptance. 5.2 For Final Acceptance, The Contractor Is Obliged To Prepare All Necessary Documents That Meet The Requirements Of The Construction Law And Resulting From Udt Provisions, Including Udt Permission For Use. 6.2 The Contractor Shall Provide The Employer With The Construction Documentation And As -Built Documentation With All Necessary Protocols From Rehearsals And Measurements, As Well As Approvals And Approvals,
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.