Project And Scoping Documentation For Expansion Of The Road Ul. Strzelecka For Roads For Pedestrians And Bicycles In Kędzierzyn-Koźlutal Order Dictionary (Cpv): 71320000-7-Engineering Services In The Field Of Design1. The Subject Of The Contract Is The Development Of Comprehensive Project And Scoop Documentation For The Investment Task Entitled: Project And Cost Of The Road Expansion Ul. Strzelecka For A Route For Pedestrians And Bicycles In Kędzierzyn-Koźle On A Section From The Existing Road For Pedestrians And Bicycles At Strzelecka Street To The Intersection With The Public Road Of Ignacy Daszyńskiego And Covering In Particular The Following Range: 1) Pre-Project Studies: A) Geodetic Studies, B) Geodetic Documentation, C) Documentation Regarding Road Traffic Program And Spatial Concept With Dendrological Inventory And Its Positive Agreement With The Employer, Road Administration And The Right Council Of The Estate (Agreement With Ro On The Part Of The Employer); 3) Preparing Materials For Obtaining A Decision On Environmental Conditions For Consent For The Implementation Of The Project, Hereinafter Referred To As The Environmental Decision And Obtaining On Behalf Of If Necessary); 4) Preparing Materials For Obtaining A Water Permit And Obtaining On Behalf Of And For The Contracting Authority The Decision (If Necessary); 5) Preparing The Necessary Materials For Issuing A Decision On Permission To Implement A Road Investment (Hereinafter Referred To As Zrid) In The Case Of The Act Of 10 April 2003 On Special Rules For The Preparation And Implementation Of Investments In Public Roads, Including Composed Of: A.1. Plot Or Land Development Project, A.2. Architectural And Construction Project, A.3. Technical Design, A.4. A Set Of All Conditions, Arrangements, Opinions Or Decisions Required By Law, Including Obtaining A Derogation From Technical Conditions (If Necessary), Or Environmental Decision And Water Law (If Necessary), A.5. Information On Safety And Health Protection; B) Other Materials Required For The Application For The Issue Of Zrid, C) Complete Geodetic And Legal Documentation Related To The Purchase Of Real Estate Located In Lines Demarcating The New Belt And The Temporary Use Of Real Estate In Connection With The Conduct Of Works In Their Area, D) Documentation For Compensation And Obtaining On Behalf Of And For The Contracting Authority; 6) Preparing Documentation For Notification Of Works Not Building Permit Decisions Or For Demolition Facilities (If Necessary) And Its Effective Notification; 7) Preparation Of Complete Documentation For Conducting The Tender Procedure For The Performance Of Works, Including: A) Executive Projects For Individual Industries, B) The Bill Of Quantities For Individual Industries, C) Investor Cost Estimates Of Individual Industries Together With The List Of Costs Of The Entire Investment, D) Technical Specifications And Acceptance Of Construction Works For Construction Works Individual Industries; 8) Devel
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.