The Subject Of The Contract Is The Provision Of The Service Cleansing And Maintaining Cleanliness In The City Of Wąbrzeźno In The Years 2025-2026. Things Include: 1) Ongoing Maintenance Of Streets, Pavements, Pedestrian-Eater, Parking Lots, Openwork Parking Spaces, Squares, Bicycle Paths And Access To Them, Public Transport Stops By Mechanical Or Manual Sweeping; 2) Mowing Grass Adjacent To The Maintenance Road, To The Borders Of Real Estate And Collecting Cut Grass In Accordance With Annex 1 Of The Schedule. Max. Grass Height Up To 10 Cm. During The Drought Period, Cutting Off The Roots Of Other Plants Protruding Above The Height Of The Grass; 3) Export Of Collected Waste To The Regional Municipal Waste Processing Installation; 4) Cleaning Roads, Pavements, Pedestrian And Bicycle Paths, Parking Lots, Squares And Public Transport Stops And Sewage Grates Of Rainwater In Streets With Weeds With The Possibility Of Using Chemicals Once A Month; 5). Leaves, Snow, Ice And Mud Surface Of Roads, Pavements, Squares, Parking Lots And Bicycle Paths, Public Transport Stops And Rainwater Sewage Grates In The Streets, As Well As Removing Impurities Resulting From Winter Maintenance (Sand And Other Agents Used Against Lumps); 6) Combating Bolts, Which Means In Particular The Freezing Of A Thin Water Layer, So -Called Freezing Drops Of Rain, Drizzle On The Surface Of A Cool Road Lane To A Temperature Lower Or Slightly Higher Than 0O C; 7) Removal Of Snow In Parking Lots And Roadsides, If Its Quantity Causes Disruption Of Traffic Fluidity In Both Directions And Prevent Car Parking; 8) Providing By The Contractor, In The Event Of Snow Removal, Specialist Marking (Barriers, Bars Etc.), For The Safety Of Traffic Users; 9) Ensuring Additional Cleaning And Mowing In The City Before The Celebrations And Holidays In Accordance With The Order Of The Ordering Party, About Which The Contractor Will Be Notified By The Employer 7 Days Before The Planned Celebrations And Holidays (Max. Up To 7 Times A Year); 10) Submitting By The Contractor, Daily Until 8:00, Detailed Written Report From The Engaged Equipment And People With The Scope Of Tasks To Perform In The Given Given. Day, 11) Preparation Of A Mixture Of Sand And Salt In The Presence Of The Contracting Authority. The Payment Obtained Funding From The Government Road Development Fund For Zadnie. Construction Of Modrzewiowa St. In Wąbrzeźno. In Addition, The Reconstruction Of Sienkiewicza Street And Access Roads And Pavements For Multi -Family Buildings On Niedziałkowskiego Street Are Being Implemented. Forecasted Termination Of The Abovementioned Robót - Until The End Of February 2026, The Reconstruction Of The Section Of Ul. Under The Miller Connecting Ul. 11 Listopada With The Ryńsk Commune And Reconstruction Of The Road Ul. Okręcna - Connecting Ul. 11 November With Ul. Rye In The Ryńsk Commune. Completion Of The Implementation According To The Current Annex To The Contract- By The End Of August 2025. In Addition, In T
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.