Tenders Are Invited For Development Of A Functional And Utility Program As Part Of The Task Entitled Development Of Rainwater In The Paris Potoka Basin
Tenders Are Invited For Development Of A Functional And Utility Program As Part Of The Task Entitled Development Of Rainwater In The Paris Potoka Basin
The Subject Of The Contract Includes The Performance Of A Functional And Utility Program, Hereinafter Referred To As Pfu, Including The Reconstruction Of The Ditch Along With The Reconstruction And Strengthening Of The Ditch And Dna Of The Ditch, Construction Of The Reservoir/Retention/-Ych, Renovation Of The Existing, Or The Demolition And Construction Of Culverts On The Rebuilt Ditch Along With Determining The Planned Costs Of Design Works And Construction Works Included In The Investment Task As Pn.: „Zagospodarowanie Wód Opadowych Na Terenie Zlewni Potoku Paryja”.Wielkość/Zakres:Przedmiot Zamówienia Obejmuje W Szczególności:1)Wykonanie Programu Funkcjonalno-Użytkowego, Zgodnie Ze Specyfikacją Warunków Zamówienia (Swz), Umową, Załącznikiem Nr 2 Do Umowy Określającym Szczegółowy Zakres, Wymagania I Oczekiwania Zamawiającego Względem Pfu Oraz W Oparciu O Wymagania Zawarte W Programie Funduszy Europejskich Na Infrastructure, Climate And Environment 2021-2027-Operation Fenx.01.02 Adaptation Of Urbanized Areas To Climate Change Constituting Annex 3 To The Contract, 2) Implementation Of The Preliminary Land Development Project (Concept For The Reconstruction Of The Ditch And The Construction Of The Tank/-Ów), 3) Performing The Inventory Of The Geodetic Route I.E. Culverts, 4) Developing Documentation Of Soil Substrates And A Geotechnical Project (On The Route Of The Rebuilt Ditch And In The Place Of The Proposed Location Of The Reservoirs) In Accordance With The Regulation Of The Minister Of Transport, Construction And Maritime Economy Of 25 April 2012 On Determining The Geotechnical Conditions For Establishing Building Objects, 5) Performing Hydrological And Hydraulic Calculations, Including Modeling, 6) Execution Of Dendrological Inventory And Dendrological Report, 7) Execution Of A Collective Statement Of The Costs Of The Planned Investment (Planned Costs Of Design Work And Construction Works), 8) Preparation Of Documents Necessary For The Contracting Authority To Obtain Technical Conditions And Other Documents, Necessary To Perform Pfui, Based On It Based On It. The Subject Of The Contract Should Be Treated As Complementary. 2) The Contractor Is Obliged To Perform Under The Contract All Services And Works Not Mentioned In Opz And Necessary For The Comprehensive And Comprehensive Performance And Completion Of The Subject Of The Contract. In Case Of Doubt, It Is Considered That The Contractor, When Submitting The Offer, Undertook All Works Aimed At Comprehensive, Correct, Timely And Proper Performance Of The Subject Of The Contract. 3) Pfu Must Contain Information And Documents Necessary To Design And Perform Construction Works Specified In Annex 2 To The Contract And In Accordance With Chapter 4 Of The Regulation Of The Minister Of Development And Technology Of 20 December 2021 On A Detailed Scope And Form Project Documentation, Technical Specification And Acceptance Of Construction Works As Well As A Functional And Utility Program. 4) Pfu Will B
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.