Establishment Of Road Fields From Bilateral Reserves With Grader-Elevators, Group: 3, Construction Of The Grounds And Smoothing Layers: Sand-Gravel Mixture, From Large Sand, Setting Up The Thickness Of 6 Cm From A Thick-Small-Grained Abv-Type Hot Asphalt-Concrete Mixture, Density Of Stone Materials: 2.5-2.9 T / M3, Demolition Of Roofing: Wavy And Semi-Chrysmith Chrizolitsement Sheets, Demolition Of Cages: Intermediate Boards And Beams, Manually Drilling The Depth Without Fastening For Support And Columns To 0.7 M, Group Of Group: 3, Installation Of Support Columns For Braces: Up To 24 M, Establishment Of Common Concrete Foundations For Columns, Volume: Up To 3 M3 (B 20 Brand), If The Steps Of The Farms Are Up To 12 M, The Installation Of Choppy, The Height Of The Building: Up To 25 M (80X80 / 24), Up To 25 M Altitude, The Installation Of Roofs And Stray Farms To 24 M, Mass: Up To 3 T, Establishing Networks By Creating Gaps Between The Beams., Correction Of Roofing From Metal Ceramite On Finished Support Beams: A Simple Roof Cover., Establishment Of Concrete Prepared Layer (Perimeters B 15 Brand), Installation Of Concrete Bort Stones: In Cement-Concrete Coatings
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.