Substation Construction Work - “High Tire System 110 Kv In The N/St“ Smoked ”110/20/6 Kv”. The Contract Is With The Site Of Construction And Includes The Following Construction Works: Dismantling Of A Conductor 1Haso 500 From The Bar A (Southern Country) And A B Bar, Including The Deviations To The Rod Disconents And The Apparatus Terminals For Them. Dismantling Of The Oshnovka In The Seslavtsi Field From Rod Divisions To A Linear Disconnector, Including The Deviations To The Circuit Breaker And The Apparatus Terminals For All Facilities In The Field. Delivery And Installation Of Composite Conductor Type Aaas Or Equivalent With A Section Approximately 996 Mm2 To Replace The Southern Part Of The Bar A And Bar B, Including The Deviations To The Tires And The Apparatus Terminals For Them And The Deviation From The Southern Part Of The Bar A To The Northern Part. Installation Of Spacers, 2 Pcs. For Each Stretch Field. The Spacers Are The Delivery Of The Contracting Authority. Delivery And Installation Of Composite Conductor Type Aaas Or Equivalent With A Section Approximately 996 Mm2 To Replace The Oshilation In The Seslavtsi Field From Rod Divisions To A Linear Disconnector, Including The Deviations To The Circuit Breaker And Apparatus Terminals For All Facilities In The Field. Replacement Of All M20 Connecting Bolts Of The Bond Of The Rigelcolon Of The Cervical Portals Affected By The Reconstruction With Galvanized M20 With A Strength Of 8.8. Replacement Of All M16 Connecting Bolts Of The Rigelcolon Connection Of All Linear Portals With Galvanized M16 With A Strength Of 8.8. The Period For Complete Execution Of The Contract Is 105 Calendar Days, Including: - 60 Calendar Days For Preparatory Activities (Delivery Of Materials And Facilities) As Of The Date Of Conclusion Of The Contract Until The Date Of The Notification Letter To The Contracting Authority For Completed Preparatory Activities. - 45 Calendar Days For The Implementation Of The Construction Works, Starting From The Date Of Signing A Protocol For The Opening Of A Construction Site, Until The Date Of The Notification Letter To The Contracting Authority For The Completed Construction Works. A Prerequisite For Participation In The Procedure Is To Perform An Inspection. A Written Request Is Submitted To The Contract To The Contracting Authority Through The Centralized Electronic Public Procurement Platform.
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.