Arab World1,Gulf Cooperation Council, GCC,Middle East,Middle East and North Africa, MENA
09-09-2025
Work Detail
Quotation are invited for M Station HRSG LP Steam Outlet Isolation Valve Body Seat Weld Repair and Machining. TECHNICAL AND GENERAL SPECIFICATION OF OUTSOURCING WORK M STATION, JEBELALI POWER STATIONTITLE: M STATION HRSG LP STEAM OUTLET ISOLA TION VALVE BODY SEAT WELDREPAIR AND MACHINING, SIZE: 38 INCHA. QUANTITY & SPECIFICATION:# QUANTITY: 01 NOS.# SIZE: 38 IN# CLASS: 150 # BODY SEAT & DISC MATERIAL: ASTM A216 WCB# SEAT: A240T316# TYPE: TRIPLE ECCENTRIC BUTTERFLY VALVE# REFER ATTACHED VALVE DRAWING.B. WORK DURATION:# TO BE COMPLETED IN 05 DAYSC. PRE-BID SITE INSPECTION:# THE CONTRACTOR SHALL VISIT THE WORKSHOP AND INSPECT THE VALVE AND BEFULLY FAMILIAR WITH THE WORKSCOPE, BEFORE SUBMITTING THE BID. DEWA WILL NOT ACCEPT ANY CLAIM FOREXTRAS BEYOND THE ORDERRATES / PRICES DURING AND AFTER THE EXECUTION OF WORK.CONTACT DETAILS FOR SITE VISIT1. SHABBIR AHMAD043225969SHABBIR.ENULHAQUE@DEWA.GO V.AE 2. ASHIL PRABHAKAR0585839585ASHIL.PRABHAKAR@DEWA. GOV.AED. QUALIFICATION OF BIDDER:# THE BIDDER SHALL HAVE PROVEN EXPERIENCE FOR SIMI LAR JOBS AND SHALLSUBMIT EVIDENCE.DEWA-CONFIDENTIALE. SCOPE OF WORK:# COLLECT THE VALVE & SPARE SEAT RING WITHIN 01 DAY AFTER RECEIV ING POFROM DEWA#S PERMISSIBLE# CONDUCT INSPECTION OF THE VALVE BODY SEAT AREA USING APPLICABLE NDEMETHODS TO IDENTIFY ALL THEDEFECTS AND SUBMIT REPAIR PROCEDURE TO DEWA.# CARRY OUT WELD REPAIR OF THE BODY SEAT (SEAT MATERIAL IS AS PERATTACHED DRAWING)# WELDING IS TO BE DONE BY QUALIFIED WELDER ACCORDING TO APPLICABLE WPS& ASME REQUIREMENTS.# CONDUCT APPLICABLE NDE (MPI, DPT ETC.) AFTER THE REP AIR WORK.# MACHINE THE BODY SEAT AND MATCH WITH SEAT RING.# CONDUCT APPLICABLE NDE (MPI, DPT ETC.) AFTER MACHINING WORK.# PROVIDE TH E COMPLETE REPORT WITH PHOTOS INCLUDING ALL NDE REPORTS.# AFTER SUCCESSFUL COMPLETION OF THE REPAIR WORK , ARRANGE THE TESTINGOF THE VALVE AND SUBMIT THEREPORT BEFORE DELIVERY THE VALVE BACK TO DEWA.NOTE: SCOPE OF WORK MENTIONED HERE ONLY PROVIDES BROAD OUTLINE OF THETASK. THE BIDDER ISEXPECTED TO REVIEW THE ADEQUACY OF THE PROPOSED SCOPE OF WORKS TO CARRYOUT REQUIRED TASK ANDADD ANY ADDITIONA L WORKS THAT ARE NEEDED FOR SATISFACTORY COMPLETION OFTHIS PROJECT.F. WARRANTY# THE WARRANTY PERIOD FOR THE WORK SHALL BE 01 YEAR FR OM THE DATE OFCOMPLETION OF WORK CERTIFIEDBY DEWA.# IN CASE OF ANY DAMAGE/DEFECT OF THE WORK CARRIED OUT UNDER THISCONTRACT WITHIN T HIS WARRANTYPERIOD, THE CONTRACTOR SHALL CARRY OUT THE NECESSARY REPAIR WORK ANDRECTIFY THE DEFECT WITHINSHORTEST PERIOD. Qty: 1 M Station HRSG LP Steam Outlet Isolation Valve Body Seat Weld Repair and Machining, size: 38 inch. (SCOPE OF WORK ATTACHED) CONTACT-shabbir.enulhaque@dewa.gov.ae (043225969) STANDARD TERMS & CONDITIONS 1) Prices should be DDP delivery duty paid at DEWA stores. 2) Quotation to be submitted only in local currency U.A.E Dirhams 3) DEWA Standard payment terms is 30 days credit from the date of acceptance of material 4) No DEWA staff or his or her relatives up to third degree should have ownership or partnership in your company, and your participation in DEWA tenders / RFQs should not constitute a Conflict or perceived Conflict of Interest. Supplier Registration: https://srm.dewa.gov.ae/irj/portal/anonymous/regis Tender Link : https://srm.dewa.gov.ae/sap/opu/odata/sap/ZSRM_RFX_REG_BID_SRV/AttachmentSet(2332502194)/$value
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.