The Purpose Of The Intended Construction Works Is To Sweep The Entire Water Supply Installation, With Horizontal Parts In The Basement Floor Being Filled With Galvanized Pipes And Vertical Branches With Polypropylene Pipes With Basalt Insert. The Execution Of The Public Procurement Includes The Following Construction Works: Spoil Plasterboard Lining Of Existing Suitcases In The Absence Of Revisions And Dismantling Of The Existing Water Supply Installation For Hot And Cold Water; Delivery And Installation Of Galvanized Pipes For The Basement Floor And Polypropylene Pipes With Basalt Insert For Vertical Branches; Delivery And Installation Of Thermal Insulation Of Polyethylene Foam For Pipes; Delivery And Installation Of Shut -Off Valves With Empty Deposits At The Beginning Of Each Vertical Bar. Restoration Of Plasterboard Boxes With Openings Around Revisions, Delivery And Installation Of Revisions; Delivery And Installation Of Water Meters For Hot And Cold Water; Collection, Loading And Removal Of Construction Waste. The Required Types And Quantities Of Repair Work Included In The Volume Of The Order Are Described In Detail In The Quantitative Account, Which Is An Integral Part Of The Technical Specification.
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.