Adding Or Exiting Or Exiting The Norm Of 0.5 Cm In The Thickness Of The Cover 0.5 Cm (Additional 1Sm), Construction Of A Thick-Skinned Boiling-Grower-Grower-Grower-Growing Boiling Thickness Of 4 Cm Thickness, Density Of Stone Materials: 2.5-2.9 T / M3, Printing Works By Casting Bitumen Emulsion By Applying The Auto, Sand-Gravel Mixture Of Optimal Granulometric Or Combination Of Red, Construction Of The Grounds And Smoothing Layers: Sand-Gravel Mixture, From Large Sand, Add To 01-02-002-03 During Each Subsequent Departure On A Trace (An Additional 3 Departure), Configuring Soil In The First Walk On A Trace With 8 T-Luced Trailing Trailing, Thickness Of The Layer: 20 Cm, Mechanized Planning Of Areas, Group Group: 2, Fulfillment Of Work On The Ground In The Soil, Group Of Group: 2-3, Freight Ozboshael Car, 10T Transportation Distance - 5 Km. 1St-Grade Load, The Capacity Of The Clamp With 0.5 (0.5-0.63) M3 Is The Excavators Of The Group, Group Of Group, Group: 2 (Useless Soil)
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.