The Subject Of The Public Contract Is To Perform A Work Consisting Of The Construction Of A New Wastewater Treatment Plant And Accompanying Buildings And Technologies And Its Connection To The Existing Wastewater Treatment Plant (Hereinafter Referred To As The “Work”), To The Extent According To This Tender Documentation. The Work Concerns Both Building Modifications And Technological-Technical Equipment Of Existing Wwtp Buildings, Corresponding Engineering Networks And Technological Connections-Gross Pre-Cleaning, Blowers, New Activation Tanks, Storage Tanks Of Sludge And Installation Tanks. The Work Will Also Include The Necessary Adjustments To The Terrain And Greenery Around It. The Surrounding Plots Will Be Affected By The Intensification Of The Wwtp, The Construction Site Will Exceed The Existing Land Of The Village (59/2 In The Cadastral Area Of Sedlec Near Líbeznice), On Which The Sedlec Area, The Engineering Network Related To Operation And Fencing Lies. The Contractor Is Obliged To Ensure The Issue Of Transport Engineering Authorization (Dio). When Implementing The Work, The Supplier Is Obliged To Follow The Project Documentation, Which Consists Of Annex 2 Of This Tender Documentation And Building Permits, Which Form Annex 8 Of This Tender Documentation.
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.