1. The Scope Of The Basic Contract1) The Subject Of The Basic Contract Is The Performance Of A Complete, Multi -Branch Project Documentation For The Reconstruction Of Rabowicka, Starowiejska, Sportowa, Topolowa, Akacjowa, Lipowa And Słoneczna Streets In Gowarzewo, Kleszczewo Commune, Together With Dehydration, To The Extent Necessary To Obtain All The Law, And Enabling The Contracting Authority And Enabling The Contracting Authority, Enabling The Contracting Authority And Enabling The Contracting Authority And Enabling The Contracting Authority And Enabling The Contracting Authority, The Award Of A Public Procurement For The Implementation Of Construction Works.A) The Documentation Will Be Developed In Accordance With Applicable Regulations, In Particular With The Act Of 7 July 1994 - Construction Law And Executive Regulations, In The System Specified In The Regulation Of The Minister Of Development Of 11 September 2020 On The Detailed Scope And Form Of The Construction Project, And Will Cover In Particular: Obtaining And Updating The Maps For Design Goals In Design Goals In Scale Appropriate For The Investment, With Armament Applied And Verified In The Area, B) The Implementation Of Geotechnical Tests And The Development Of Geotechnical Opinion And - If Needed - The Determination And Engineering Documentation, In Accordance With The Geotechnical Category Of The Object, C) Implementation Of A Construction Project And A Technical Design In The Road Industry (Pzt, Pab, Pt), Including: Road Geometry, Cross -Sections, Profiles, Constructions Of Road Surface, Pavements And Bicycle Paths, Dehydration, Traffic Safety Elements, D) Execution Of Reconstruction Projects Or Technical Infrastructure Networks And Equipment, Including: - Rainwater Sewage System, - Water Supply Network And Sanitary Sewage System - In Terms Of Collision, - Gas Network - In The Field Of Collision, - In Terms Of Collision - In The Field Telecommunications Networks - In The Field Of Collisions, - Drainage Facilities And Road Culverts - In The Field Of Collision Or Reconstruction, E) Execution Of The Road Lighting Construction Project In Ul. Starowiejska, Lipowa, Akacji And Popopol, F) Performing A Design Of Lighting For Pedestrian Crossings, G) Developing A Design Of The Target Vertical And Horizontal Marking As Part Of A Permanent Traffic Organization, H) Developing A Drainage Project Outside The Road Lane, Including Possible Green And Blue Solutions (E.G. Rain Gear, Retention Reservoirs), If Required, And) With The Development Of A Project Of The Standing Of The Stand And The Plant Planting, J) Developing A Water Law Report Together With A Complete Application And Obtaining A Decision Of A Water Permit, K) Developing An Information Card Of The Project Or An Environmental Impact Report (Depending On The Requirement) And Obtaining A Decision On Environmental Conditions, L) Obtaining A Decision Allowing For Removing Trees And Shrubs, Required, M) Developing A Project Of Temporary Tra