The Subject Of The Order Is To Adapt The A-2 Building To Current Fire Protection Regulations, Including: 1. Construction Works:- Demolition Works In The Field Of Window And Door Joinery Intended For Replacement Along With The Expansion Of The Door Openings- Demolition Of Existing Wall Cladding In The Corridors, Along With The Subsequent Finish Of The Walls With Painting Coating- Partial Demolition Of The Attic Covering Extreme Flap- Local Demolition Of Suspended Ceilings Along With Subsequent Reconstruction In Order To Separate Atrials For Signs Ensuring Safe Waiting For Saving- Elimination Of Installation Collisions Resulting, Among Others Out Of The Need To Introduce Wardrobes On Gas Cylinders- Elimination Of An Unused Fan Cage Outside The Building To Locate A New Outer Frame On The Cylindrical Cylinders- Making An Off-Road Access To The Outer Cage- Making Fire Housings Releasing Staircases- Strengthening The Ceilings In The Location Of Wardrobes On The Cylinders- Delivery And Installation Of Safety Wardrobes For Gas Bottles- Delivery And Installation In The Fire Resistance Design- Housing Of The Existing Skylight To The Required Fire Resistance- Delivery And Assembly Of Tilting Gates Preventing The Descent To The Basement- Making The Vagina At Staircase Of Staircases Kl1 And Kl22. Electrical Robots:- Disassembly Of The Old And Unnecessary Electrical Installation,- Assembly Of New Cable Routes Along With Ordering The Existing Cabling,- Execution Of A New Wiring For Implemented Installations,- Execution Of A Complete Installation Of Emergency And Evacuation Lighting,- Implementation Of General Lighting Installation,- Retrofitting Of A Two-Story Switchgear,- Modernization Of Separate Installations,- Implementation Of Evacuation Intercom Installation For People Disabled, - Delivery And Assembly Of Fire Acceptance Switchgears, - Implementation Of Installation Of Supplies Of Ventilation Devices, - Complete Fire Signaling Installation, - Complete Smoke Removal Installation Of Staircases, - Gas Detection Installation. 3. Sanitary Robots:- Chapter Of Utility And Hydrant Water Installation,- Liquidation Of Existing Hydrants,- Execution Of A New Hydrant Installation With The Necessary Fittings, Including: Solenoid Valve, Anti-Spine Valve,- Delivery And Installation Of New Hydrant Cabinets Equipped With Fire Extinguishers,- Execution Hydrant,- Performing Measurements Of Hydrant Efficiency,- Fire Protection Of Existing Ventilation Installations,- Implementation Of Ventilation Installations For The Purposes Of Operating Wardrobes For Gas Cylinders,- Buildings Of Ventilation Ducts With Fittings, Valves, Flow Regulators,- Roof Base And Roof Fans,- Emergency Ventilation,- Installation Of Fire Flaps, Technical Gases Together With, Among Others: Pipelines, Fittings, Reduction Nodes, Reduction Panels, Hazardous Gas Detection System, Gas Deficiency Signaling System, Fire Protection Transitions Of Technical Gas Installations In Fire Protection Zones.
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.