GTR 101186017
Bids Are Invited For Hiring A Specialized Company To Revitalize The “Moinho São Domingos” Building, Property Listed From The Municipality Of Cordilheira Alta/Sc (Municipal Decree No. 378/2022), Located At Avenida Fermino Tozzo, 454, Centro Neighborhood, Cep 89.819-000, According To Projects, Memorial, Art And Other Terms Of This Notice, With A View To The Realization Of The Project São Domingos ”, Pursuant To Case No. 2023/023189 And Agreement No. 08/2024/Frbl, Celebrated Between The Public Prosecution Service Of The State Of Santa Catarina (Mpsc), Through The Fund For The Reconstitution Of Injured Goods (Frbl), And The Municipality Of Cordilleira Alta.
ICB — International Competitive Bid
Closed
South America
Tender Information
GTR Reference
101186017
Tendering Authority
Subscribe to view
Tender No
4/2025
Financer Name
Self-Funded
Work Title
Bids Are Invited For Hiring A Specialized Company To Revitalize The “Moinho São Domingos” Building, Property Listed From The Municipality Of Cordilheira Alta/Sc (Municipal Decree No. 378/2022), Located At Avenida Fermino Tozzo, 454, Centro Neighborhood, Cep 89.819-000, According To Projects, Memorial, Art And Other Terms Of This Notice, With A View To The Realization Of The Project São Domingos ”, Pursuant To Case No. 2023/023189 And Agreement No. 08/2024/Frbl, Celebrated Between The Public Prosecution Service Of The State Of Santa Catarina (Mpsc), Through The Fund For The Reconstitution Of Injured Goods (Frbl), And The Municipality Of Cordilleira Alta.
Bid Type
ICB — International Competitive Bid
Country
Subscribe to view
Geographical Region
South America
Political Region
BRIC,G20
Last Date of Bid Submission
16-09-2025
Closed
Work Detail
Workplate (For Civil Construction) In Galvanized Plate *N. 22*, Adhesive, Of*2, 4 X 1, 2*M (Without Posts For Fixation), Container Rental 2, 30 X 6, 00 M, Alt. 2, 50 M, With 1 Sanitario, For Office, Complete, Without Internal Partitions (Not Included Mobilization/Demobilization), Siding With Metallic Tile. Af_05/2018, Civil Engineer Of Full Work With Complementary Charges, General In Charge With Complementary Charges, 08/29/2025, Entry Of Electricity, Air, Single Phase, With Overlapping Box, 10 Mm2 Cable And Din 50A Circuit Breaker (Not Included The Concrete Pole). Af_07/2020_Ps, Double T -Dryed Concrete Post, 8 Dan Resistance, Type D, Type D, Pillars Demolition And Reinforced Concrete Beams, Manually, Without Reuse. Af_12/2017, Wood Floor Removal (Floor And Barrot), Removal Of Wood Pieces, With 8M Or Equal To Mechanized, With Reuse. Af_12 / 2017, Demolition Of Massif Brick Masonry, Load, Maneuver And Discharge Of Truck Truck 6 M³ - Hydraulic Excavator Load (0, 80 M³ / 111 Hp) And Free Discharge (Unit: M3). Af_07/2020., Removal Of Fiber Cement, Metal And Ceramic Tiles, Using Crane, Removal Of Scissors, Frames Removal, Metal Beam In Laminated Profile Or Soldier In Structural Steel, With Screw Connections, Inclusive Labor, Transportation And Lifting Using Crane - Supply And Installation - Pillaring Suppling, Friending And Installation - Or Conventional Reinforced Concrete Structure Beam Using Ca Steel Of 6, 3 Mm - Assembly. Af_06/2022., Frame Pillar Or Conventional Reinforced Concrete Structure Beam Using 10, 0 Mm - Assembly Steel. Af_06/2022., Frame Of Pillar Or Beam Of Conventional Reinforced Concrete Structure Using Ca Steel Of 12, 5 Mm - Assembly. Af_06/2022., Manual Excavation For Crowning Block Or Shoe (Without Excavation For Format Placement). Af_06/2017, Concreting Of Crowning Blocks And Baldrames Beams, Fck 30 Mpa, Using Pump ˘ Launch, Densification And Finishing. Af_06/2017, Ca Steel Blazer - 50 - D = 20 Mm - Anchored In The Rock With Cement Cartridge - Supply, Drilling And Installation., Densification And Finishing. Af_06/2017 .., Mounting And Disassembly Of Rectangular Pillars And Similar Structures, Simple Grassie, Plasticized Plywood Sheet, 10 Uses. Af_09/2020., Unidirectional Pre -Molded Slab, Biapoiada, For Flooring, Ceramic Filling, Conventional Vigote, Total Slab Height (Filling+Cover) = (8+4). Af_11/2020_Pa., Pillar Frame Or Conventional Reinforced Concrete Structure Beam Using Ca Steel Of 5, 3 Mm - Assembly. Af_06/2022 .., Pillar Frame Or Beam Of Conventional Reinforced Concrete Structure Using Ca Steel Of 8, 0 Mm - Assembly. Af_06/2022 .., 5 Mm - Assembly. Af_06/2022 .., Pillar Frame Or Beam Of Conventional Reinforced Concrete Structure Using 16 Ca - 16 Steel, Pillar Frame Or Beam Of Conventional Reinforced Concrete Structure Using Ca -50 Steel Of 20, Manual Excavation For Crowning Block Or Shoe (Without Excavation For Fabric Placement). Af_06/2017 //, Roof With Steel Tile/Aluminum E = 0, 5 Mm, Up To 2 Waters, Included Lifting. Af_07/2019, External Rufo/Internal In Galvanized Steel Plate Number 26, 33 Cm Cut, Inclusive Lifting. Af_07/2019Ger, Venetian Type Aluminum Type With Electrostat Painting
Key Value
Tender Value
3,043,610 - BRL
Tender Documents
Global Tender Document
a31a929b-0987-4f7c-ab44-5608b21370e9.html
Attachments
Additional Details Available on Click
- Tendering Authority
- Publication Document (Tender Document / Tender Notice)
Disclaimer
We take all possible care for accurate & authentic tender information. However, users are requested to refer to the original Tender Notice / Tender Document published by the Tender Issuing Agency before taking any decision regarding this tender.