Information To Be Repaired: The Municipality Of Karstula Will Request Your Tender For A Change In The Heating Of The Industrial Hall Called The Reception Hall. Current Oil Heating Will Be Removed And Replaced With A Geothermal Turnkey Basis. The Building Was Originally Built In The 1980S And Was Expanded In The Early 2000S And Has Been Renovated In 2022. The Current Floor Area Approx. 945M2 And Volume 3400M3. The Facilities Are Mainly A Uniform Space. The Target Has Water -Based Radiator Heating. In Addition, The Air Conditioner Has A 54Kw Post -Heating Radiator. The Power Of The Post -Heating Radiator Can Be Adjusted With The Current Automation. The Use Of Hot Water Is Low. The Current Boiler Is 100Kw. The Contract Includes Connecting The Existing Pipeline System To New Equipment And Demolition Of The Decommissioning Oil Heating System. The Contractor Recycles The Materials He Has Dismantled In Accordance With Valid Laws And Regulations. The Contractor Is Responsible For The Interior Demolition Of The Building And The Subscriber For The Demolition Work Outside The Building. The Estimated Power Of The System Is 80Kw, Whereby The Geothermal Heat Pump Must Produce A Minimum 60Kw Power And The Electrical Resistance Can Produce The Rest. The Contractor Also Offers An Increase In The 100Kw Hardware As An Option, Which Produces 80Kw Power And Electrical Resistance. The New Equipment Will Be Installed Primarily In The Current Heat Distribution Room N. The Accuracy Of The Original Plans According To The Work. The Tenderer Is Recommended To Explore The Site On Site.In The Time Of The Contract, The Job Is Two (2) Years And 5) Years For The Equipment. Correction: The Municipality Of Karstula Will Request Your Tender For A Change In The Heating Of The Industrial Hall Called The Reception Hall. Current Oil Heating Will Be Removed And Replaced With An Air Water Heat Pump On The Turnkey Basis. The Building Was Originally Built In The 1980S And Was Expanded In The Early 2000S And Has Been Renovated In 2022. The Current Floor Area Approx. 945M2 And Volume 3400M3. The Premises Are Mainly A Uniform Space. The Site Was Originally Divided Into Three Actors And The Technology Is Built So That Each Has Been Individually Billed By Electricity, Water And Heat. Now There Is Only 1 Electrical Connection And A Ventilation Unit. The Ventilation Unit Has A Lto. The Target Has Water -Based Radiator Heating. In Addition, The Ventilation Unit Has A 54Kw Post -Heating Radiator. The Heating Radiator Of The Ventilation Unit Is Connected In The Same Water Cycle As Other Radiators. The Power Of The Post -Heating Radiator Can Be Adjusted With The Current Automation. The Use Of Hot Water Is Low. The Current Oil Heating Boiler Is 100Kw. The Contract Includes Simplifying The Current Pipeline System For The Heat Distribution Room And The Dismantling Of The Decommissioning Oil Heating System. The Contractor Recycles The Materials He Has Dismantled In Accordance With Valid Laws And Regulations. The Contractor Is Responsible For The Interior Demolition Of The Building And The Customer Is Responsible For The Demolition Work Outside The Building (Barrel And Oil Tank) Demolition. Performance) Should Be 4 (A+) Or Larger.And The Heating System Is Installed By Electrical Resistors With A Dimensioning Of 120% Of The Objects Calculated Heating Power Requirement. 3X50a -> The New Heating System Is Available At A Maximum Of 3X110a. The Use Of The Use Water Is Completely Separate With An Electrical Storage. All Necessary Lvias Work. The Tenderer Is Recommended To Explore The Site On Site.In The Time Of The Contract, The Job Is Two (2) Years And 5) Years For The Equipment.
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.