Construction Of The Water Supply Under Tyränselä. The Water Pipe Is 110 Mm In Diameter, 1300 Meters Long. The Building Site Builder Requires That The Tenderer Has Become Familiar With The Contract Site And All Documents Involved In The Invitation To Tender Before Submitting The Offer. The Contractor Cannot Later Rely On Any Fact That Would Have Survived The Construction Site. The Projects Contractual Contract Is A Total Price Contract. The Contractor Acts As The Main Contractor In His Own Contract Area And As The Main Contractor And As The Main Implementer Of The Law And Ysee98 And Is Responsible For The Job Service. Contractor To Perform Side Obligations With These To The Extent That They Are Not Statutory Directly To The Subcontractor.