GTR 101093694
Tenders Are Invited For Replacement Of The Roofing In The Fire Station In Broszkowice
ICB — International Competitive Bid
Closed
central europe
Tender Information
GTR Reference
101093694
Tendering Authority
Subscribe to view
Tender No
WI.2712.13.2025
Financer Name
Self-Funded
Work Title
Tenders Are Invited For Replacement Of The Roofing In The Fire Station In Broszkowice
Bid Type
ICB — International Competitive Bid
Country
Subscribe to view
Geographical Region
central europe
Political Region
European Union
Last Date of Bid Submission
10-09-2025
Closed
Work Detail
1. Scope Of Works: A) Demolition Works And Preparatory Works) Renovation Of The Roof Truss And Roof Covering C) Renovation Of The Chimney And Replacement Of Lightning Protection System 2. The Detailed Scope Of Works Includes Project Documentation, Technical Specification Of The Execution And Acceptance Of Works, Bill Of Quantities, Arrangements, Building Permit. 3. The Attached Project Documentation Is Implemented In Stages, And The Scope Indicated Above Is One Of Its Elements. 4. Rules For Performing The Subject Of The Contract, In Particular: 1) Obligations Of The Parties; 2) Participants Of The Investment Process; 3) Deadlines4) Rules For The Performance And Settlement Of Works; 5) Suspension Of Works; 6) Types Of Acceptance And Rules For Their Conduct; 7) Quality Control - Disclosure And Removal Of Defects And Defects; 8) Contractual Penalties; 9) Contractors Remuneration And Payment Principles; 10) Changes; 10) Changes; They Were Specified In Detail In The Relevant Provisions Of The Contract - Annex 8 To Swz.5. The Contractors Remuneration Is Cost-And-Billing. 6. The Contractor Is Obliged To Prepare Simplified Cost Estimates In Accordance With The Bill Of Quantities On The Principles Set Out In Point 20.3 Swz.7. The Contractor Will Be Settled For The Subject Of The Contract On The Basis Of A As -Built Cost Estimate Based On The Actual Execution Of The Number Of Works Approved By The Ordering Party (Investors Supervision Inspector), Based On Unit Prices Resulting From Offer Cost Estimates. 8. Partial (Disposable) Invoicing Is Allowed On The Basis Of The As -Built Cost Estimate And Partial Acceptance Protocol Performed Works) And/Or The Final Invoice After Completing All Works And The Receipt Of Them By The Contracting Authority [Based On The As -Built Cost Estimate Based On The Actual Performance Of The Number Of Works Approved By The Ordering Party (Investor Supervision Inspector) And Unit Prices Resulting From The Offer Cost Estimate, Based Fathered Final Acceptance Protocol]. 9. It Is The Contractors Responsibility To Calculate In The Price Of The Offer To Protect The Building Against Atmospheric Precipitation When Conducting Works. 10. When Installing Gutters And Drain Pipes, The Mount Should Be Used To Make Insulation. 11. The Contractor Is Obliged To Include In The Scope Of Works Solutions Enabling The Performance Of Walls And Ceiling Above The Ground Floor In The Next Stage Of Thermomodernization. 12. The Contractor Should Have Appropriate Technical Equipment And Meet The Requirements That Result, Among Others From The Act Of 14 December 2012 On Waste (Journal Of Laws Of 2022, Item 699) And Executive Acts - Including Regulation Of The Minister Of Economy, Labor And Social Policy Of April 2, 2004 On The Methods And Conditions Of Safe Use And Removal Of Asbestos -Containing Products (Journal Of Laws No. 71, Item 649, As Amended). 13. The Investment Co -Financed By The Lesser Poland Voivodeship Frames Lesser Poland Tso 2025 Contract 90/D/
Key Value
Tender Value
Ref. Document
Tender Documents
Global Tender Document
48414a27-97b4-4624-96d9-75e1bff4e8ec.html
Attachments
Additional Details Available on Click
- Tendering Authority
- Publication Document (Tender Document / Tender Notice)
Disclaimer
We take all possible care for accurate & authentic tender information. However, users are requested to refer to the original Tender Notice / Tender Document published by the Tender Issuing Agency before taking any decision regarding this tender.