1. The Subject Of The Contract Is The Protection, Loading, Transport And Disposal At The Landfill Of Hazardous Asbestos -Containing Products, Collected In Real Estate Located In The Gostyń Commune In 2025, Covered By The Asbestos Removal Program From The Commune Of Gostyń. The Undertaking, Implemented As Part Of The Priority Program, National Asbestos -Containing Products, Is Co -Financed By The Provincial Fund For Environmental Protection And Water Management In Poznań And From The Own Funds Of The Gostyń Commune. 2. The Estimated Amount Of Asbestos -Containing Products For Collection, Loading, Transport And Disposal At The Landfill Of Hazardous Waste Has Been Determined In The Amount Of About 263.00 Mg. The Employer Reserves That The Estimated Amount Of Asbestos Waste Collected May Change (Depending On The Degree Of Submitting Applications By Property Owners With Asbestos, Possible Withdrawal From Participation In Funding, From The Unit Price Indicated By The Contractor In The Offer And Within The Limits Of Funds Allocated For This Purpose). When Estimating The Waste Mass, A 1 M2 Converter = 17 Kg. 3 Was Used. The Order Consists Of Two Tasks: Task No. 1: Removal And Disposal Of Asbestos Containing Products From Farms From The Gostyń Commune, In Which The Roof Covering Was Replaced As Part Of The A1.4.1 Mon. Resistance (Applies To Farms, Which The Agency For Restructuring And Modernization Of Agriculture Has Paid And Settled Funds For The Replacement Of The Roofing). Based On Preliminary Information From Real Estate Owners, In Terms Of Implementation Of Task No. 1, It Is Planned To Collect, Transport And Neutralize About 210.00 Mg Of Waste Containing Asbestos. The Deadline For The Implementation Of Task No. 1: From The Date Of Signing The Contract To 30.11.2025. Talking No. 2: Removal And Disposal Of Asbestos -Containing Products From The Gostyń Commune, With The Exception Of Real Estate Listed In Task No. 1. Based On Preliminary Information From Interested Property Owners, In Terms Of Implementation Of Task No. 2, It Is Planned To Collect, Transport And Disposal Of About 53.00 Mg Of Waste Containing Asbestos Until 15.10.2025 4. The Material Scope Of The Order (Task No. 1 And Task No. 2) Includes: - Submitting The Intention To Conduct Works For The Sanitary Inspection, Labor Inspectorate And The Building Supervision Authority, Required In Advance. At The Request Of The Ordering Party, The Contractor Will Be Obliged To Submit Copies Of The Submitted Applications Together With Confirmation Of Their Submission To The Abovementioned Bodies, Provided With A Statement Of The Contractor, From Which It Will Show That They Apply To Applications Made As Part Of The Contract- Waste. The Contractor Will Use A Weight With Valid Legalization (With A Lifting Capacity Above 1 Mg And Weighing With An Accuracy Not Less Than To The Third Place After The Decimal In Mg). Weighing Will Take Place In The Presence Of The Property Owner. The Contractor, After The Waste
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.