Railway-Track Construction Materials-Halle Stadtbahn Program, Project 24 Central Station, Delivery Soft. The Main Station Is Part Of The Halle Stadtbahn Program, Level 2. By Building The Set -Up Or Stopping Area At The Main Train Station, Operational Forced Points, Dependencies And Disabilities During Timetable Deviations Are To Be Removed. Delivery Track Surface Material - Soft / Switch Crossings • 1 Piece Of Simple Outer Arc Cross -Soft Consisting Of 2 Soft And 1 Intersection • 1 Piece Of Switch With Connecting Dike Sheet And Intersection • 1 Piece Of Switch With Connection Unplug
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.