Refuse And Waste Related Services - 3Rd Incineration Line 2K5 Sub. No. 2025-36: Wet Slag Disposal And Transport. The “2K5” Project Is The Expansion Of The Zurich-Hagenholz Kehrichtheizkraftwerk By A Third Incineration Line. The Project Consists Of The Process-Related Main And Subordinated. For Details, See Part B «Project Description». The Dry Slag Outage Of The Existing Two Lines 2K1 And 2K3 Is Converted As Part Of The Project. During The Assembly Period, The Slags Of The Two Lines Are Held Wet For Around Eight Months (2K1) Or Three Months (2K3). The Subject Of This Tender The Loading, Transport, The Extraction And Subsequent Deposit Of The Wet Slag (90 Tons Per Line Per Day) On An Approved Type D In Switzerland.