Construction Work-1H0029, New 4 Group Daycare Center St. Pius, Bad Neuenahr-Ahrweiler, Los 18-Ventilation. New Construction Of A 4-Group Daycare Center As A Replacement Building For The Stpius Daycare Center, Which Was Destroyed In The 2021 Ahr Flood. - 2 -Storey Building In Solid Construction With Etics - Building Plot Approx. 3,220 M². - Net Area Area Of Around 1,330 M². - Daycare Places In New Building Space For 75 - 95 Children - Flood -Adapted Construction In The Flood Area - District Heating And Pv - Central Ventilation System As Part Of The Loc 18 Ventilation, The Following Procurement Is Required: In The Future, The Daycare Center Should Be Mechanically Used And Vented With A Central Ventilation Device. The Individual Group Rooms Receive A Co2 Regulation So That The Ventilation Systems Can Be Operated As Required. The Central Device With 10,000 M³/H Air Volume Flow Is Installed As A Weatherproof Device On The Roof Of The Daycare Center. Fire Protection Flaps Are Used For The Penetrations Of Walls With Fire Protection Requirements. The Supply Air Is Heated Over The Heating Network In Winter, Cooled In Summer By Means Of A Climate - Split - Cascade Facilities.
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.