Construction Work - Continuation Of The Implementation Of The Task Entitled Modernization And Expansion Of The Existing Uj Campus In Krakow - Prokocim - Stage I. 1. The Subject Of The Procedure And Contract Is The Continuation Of The Implementation Of The Task Entitled Modernization And Expansion Of The Existing Uj Campus In Krakow-Prokocim-Stage I In The Scope Regarding The Didactic And Administrative Building With A Above Ground Connector (Building B) Together With The Construction Of Ul. Medical And Construction Of Ul. Defense In Krakow Together With The Construction And Reconstruction Of The Technical Infrastructure Along With The Introduction Of Changes To The Project Documentation Owned By The Ordering Party And Obtaining Relevant Decisions Required To Complete The Task. 1.1 In Accordance With Art. 257 Of The Public Procurement Law, The Contracting Authority Provides For The Possibility Of Annulment Of The Proceedings In Question, If The Public Funds That The Contracting Authority Intended To Allocate To Finance The Contract, Were Not Granted To Him. 1.2 The Subject Of The Contract May Be Financed Or Co -Financed In Particular From The European Union Or Other Funds, Obtained Under Projects Or Contracts Or External Programs Or Grants, Etc., Both Currently Implemented By The Jagiellonian University - Collegium Medicum, As Well As Implemented In The Future. 1.3 The Subject Of The Contract Was Described In Detail In The Functional And Utility Program With Attachments (Including Project Documentation, Stwiorb, Bill Of Quantities, Which Are Only An Auxiliary And Approximate Nature), Swz Entries Together With Attachments And In The Contract Template. Description Of The Subject Of The Contract Is Annex 10 To Swz. 2. As Part Of The Proceedings, The Employer Provides For A Mandatory Local Vision. 3. The Contracting Authority Requires The Provision Of A Proper Performance Of The Contract In Accordance With Point 26) Swz. 4. Contractors Jointly Applying For The Award Of The Contract - Information Contained In Point 14) Swz. 5. The List Of Subjective Means Of Evidence Is In Point 9) Swz. 6. The Employer Using The Right Arising From Art. 214 Para. 1 Point 7 Of The Public Procurement Law Provides For The Possibility Of Awarding Similar Contracts, Consisting In The Fact That Within 3 Years From The Date Of Awarding This Public Contract, He Will Award The Contractor Of Construction Works Selected In This Procedure, An Order Consisting In Repetition Of Similar Design Works In All Industries And/ Or Construction Works, I.E. Construction, Installation And Installation, I.E. Earthworks. Clippings, Collision Removal, Reconstruction And Spacers, Foundation Works, Performing Reinforced Concrete And Masonry Construction Works, Facades, Aluminum Locksmith, Insulation And Floor Layers, Foundations Insulation, Ceiling Insulation, Partition Walls, Making Plasters And Wall Cladding, Painting Robots, Painting Robots, Painting Robots, Painting Robot Internal And External Joinery, Assembly Of Toilet Cabins, Assembly Of Vaginations, Balustrades, Handrails, Assembly Of Suspended Ceilings, Assembly Of Roller Blinds And Blinds, Installation Of Sliding Mobile Wall, Installation Of Elevators, Land Development, Retaining Walls, Road Works, Assembly Of Small Archite Equipment