Construction Electricity, Construction Water Connections Earthwork (Approx. 2,500M3 Excavation) Fountain Foundations (Approx. 220M3 Concrete And Fountain Rings Approx. 128M (Dn 1200-1500) +16.5M (Dn 2000) Reinforced Concrete Work (Approx. 1040 Cbm Concrete And 138 To Reinforcement) Produced Concrete Work With Indoor Stairs And Facade Elements (Approx. 18Cbm Concrete And 2.2 Tons Of Reinforcement) Masonry Work Lime Sandstone (Approx. 1,700M2) Sealing And Insulation Work (Approx. 920 Sqm Xps Insulation, Approx. 210M2 Pmbc, Approx. 70M2 Bitumen Sealing) Sanitary Work (Dirt And Rainwater Basic Lines) Earth And Electrical Incoming Work Steel Construction Work Vendor (Approx. 37M Ipe Carrier, Approx. 70M² Trapezoidal Sheet And Sheet Steel) Rope Protection System (Approx. 32M With 5 Seconds)
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.