Building Construction: Dismantling Of Concrete Plasters And From Asphalt Each, Including Layers Of Beds; Dismantling Of Existing Floor Slabs, Manufacturing Of Flakes, E.G. T. With Trench Removal Outside In Front Of The Existing Wall And In The Building Stone; Core Drilling Through Existing Sandstone Masonry; Shalung And Concrete, Partly Against Earth, From Stamiler Concrete Foundations For The Establishment Of A Weather Protection Roof Civil Engineering: For Construction And Execution Reasons, The Crossing Of The Intermediate Passage In The Preferred Measure Protected Pipes In Which In Later Building Sections Of Sewage/Drinking Water/Domestic Water And Cables Can Be Installed. For The Installation Of The Protective Pipes, The Foundations Of The Intermediate Exposed On The Outside And From The Inside, Founding Foundation Drilling And The Protective Pipes Pp- Md Dn 110 - 315 Introduced.
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.