Electric Accumulators - Perkupa 22 Kv Switch Station - Energy Storage. The Tenderers Transport Scope Is To Obtain, Assemble, Install, Install, Test And Install On A Complete 0.4 Kv Connection Of 0.4 Kv. It Is Also The Task Of The Tenderer To Carry Out Regular Maintenance, In The Event Of A Malfunction, To Maintain Error Fixes And Group Education On The Basic Operation And Treatment Of The Electricity Storage, Which Must Be Maintained Before Completion In 2 Business Days, 5 Hours A Day For 20 People. Another Task Is To Operate The Equipment. The Electricity Storage Must Be Transported By A Central Remote Monitoring Device. The Electricity Storage Control Will Be Controlled By A Higher Level Of Energy Management System (Ems), And The Tenderer Is Responsible For Integrating The Electricity Storage To Ems. The Contracting Authority Shall Provide Existing Permits And Licensing Documentation To The Successful Tenderer. The Preparation Of The Export Design Documentation Required For The Installation Of The Energy Storage Facility, If The Tenderer Is Different From The Issued Electricity Plan, Is The Responsibility Of The Successful Tenderer, Which Shall Be Jury And Approved Before The Construction. Detailed Requirements In The Technical Description And The Draft Contract. Shipping Scope: Delivery Of Complete Battery Electricity Storage Equipment, Including: Batteries, Inverters/Converters, Auxiliary Units, Refrigerator-Heating, Ventilation System, Protection Systems, Including Secondary Overvoltage Protection (T1+T2), Fire Protection Equipment, Local Control, Communication. Delivery And Placement Of The Equipment. Provide Any Machine Needed For The Base. Installation And Assembly Of The Equipment. On -Site Installation Of The Equipment. Complete Provision Of Information Detailed For Connecting And Designing The Related Infrastructure (Ems). Testing Related Infrastructure. On -Site Receipt Examination (Review Documentation, First Test Report, Manual Operation Test). Until The Handover, The Area Should Be Maintained, With Special Attention To Quality Control, Quality Assurance, Safety And Health. The Tenderer Must Arrange For The Removal Of Waste Generated During The Work. Description Of Equipment To Be Transported: The Tenderer Must Deliver A Key Electricity Storage Equipment For The Contracting Authority, The Most Important Parts Of Which Are: The Energy Conversion And 4-Quarter Range Inverter (S), The Battery, The Auxiliary System, The Protection Equipment, Together, The Software Required For Operation And Related Licenses. Modes To Be Implemented: Network
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.