GTR 100901485
Tenders Are Invited For Reconstruction Of The Playground At The City Nursery In Siedlce
ICB — International Competitive Bid
Closed
central europe
Tender Information
GTR Reference
100901485
Tendering Authority
Subscribe to view
Tender No
F.271.44.2025
Financer Name
Self-Funded
Work Title
Tenders Are Invited For Reconstruction Of The Playground At The City Nursery In Siedlce
Bid Type
ICB — International Competitive Bid
Country
Subscribe to view
Geographical Region
central europe
Political Region
European Union
Last Date of Bid Submission
09-09-2025
Closed
Work Detail
The Order Includes The Following Works Of Stage I: 1. Disassembly Of Existing Play Equipment. 2. Making Sand Surface From 0.25 To 8 Mm With A Thickness Of 30 Cm Thick For Hic> 1.00 M Thick On The Playground - Area ~ 88 M2 Limited By Rubber Edges Embedded In A Concrete Bench With Resistance. 3. Installation Of Play Equipment In Accordance With The Pb Scope And Manufacturers Guidelines; 4. Installation Of Regulations And Garbage Cans And Benches In Accordance With Pb And Guidelines Of The Manufacturer. 5. Reclamation Of The Grassy Surface Within The Playground - Digging And Alignment Of The Area And Sowing With Grass, Undercut Of Trees Branches. 6. Reconstruction Of The Fence In Accordance With The Pb.7 Scope. Trejage. 8. Removal And Utilization Of Materials From Demolitions And Care Works Information On The Subject Of The Contract: 1. Materials Obtained From Demolition Are The Property Of The Contractor And His Duty Is Their Removal And Utilization. 2. The Detailed Scope Of Works Is Presented In The Design Documentation (Drawings And Description), Which Is An Attachment To The Specification Of The Terms Of The Contract, While The Number Of Works Should Be Treated As Additional, Auxiliary Attachments. The Contractor Should Check The Values With The Design Documentation At The Stage Of Preparing The Offer And Value All The Works Specified In The Documentation, Including In The Design Drawings. The Performance During The Implementation Of The Contract Not Included In The Prejudice Or Works In A Larger Amount In Relation To The Pre -City Adopted In The Pre -City Will Not Entitle The Contractor To Demand Additional Remuneration - If These Works Were Included In The Project Documentation Or Stwiorb. 3. All Documents Describing The Subject Of The Contract Should Be Treated As Mutually Complementary And Explaining In This Sense That In The Event Of Any Ambiguity Or Ambiguity, The Contractor May Not Limit The Scope Of His Obligation Or Due Diligence When Performing His Obligations, Resulting From The Public Procurement Contract. July 1994 Construction Law, Enforcement Provisions To This Act, Other Applicable Law, Including Environmental Protection And The Principles Of Reliable Technical And Construction Knowledge, B) Takeover Of The Construction Site In The Field Of The Subject Of The Contract, Its Security And Marking, Construction Of Construction Facilities And Removing It After Completing Works, Performing Safety And Maintenance Elements, Construction Boards, Performance Of Preparation Works, Necessary For Preparation Works, Comprehensive Implementation Of The Task, And Other Requirements, C) Analyzes Of Project Documentation As Well As Making Arrangements And Completing The Provisions Regarding The Implemented Subject Of The Contract At Your Own Expense, D) Purchase And Delivery Of Materials, Construction And Devices Necessary To Perform The Subject Of The Contract, E) Providing Materials With Technical Parameters Comparable, But Not Worse Than Desc
Key Value
Tender Value
Ref. Document
Tender Documents
Global Tender Document
ad8ed94c-1f5c-4a2c-94eb-b08778fbd4fa.html
Attachments
Additional Details Available on Click
- Tendering Authority
- Publication Document (Tender Document / Tender Notice)
Disclaimer
We take all possible care for accurate & authentic tender information. However, users are requested to refer to the original Tender Notice / Tender Document published by the Tender Issuing Agency before taking any decision regarding this tender.