- Construction Site Equipment - Approx. 370 M³ Of Excavation Excavation Excavation - Approx. 90 M³ Excavation Strip Foundations - Filter Layers And Fillings Work Space - Approx. 280 M³ Excavation For Trenches And Shafts - Approx. 550 M² Planum, Separation, Geotextil - Approx. 310 M Of Sewer - Approx. 135 M Drainage Lines - Control Shafts And Fat Separators - Approx. 180 M³ Of Lean Concrete - Approx. 64 M³ Of Reinforced Concrete Strip Foundations - Approx. 112 M³ Of Reinforced Concrete Floor Slab - Reinforced Concrete Ongoing On A Floor Slab - Produced Concrete Staircase, Foundation Heat Pump