Excavators With 0.5 (0.0.63) M3 With The Capacity Of 0.5-0.63), Drilling By Loading The Cars In The Cars, Group: 2, Ozuboshal Car, 17 T Transportation Distance - 5 Km. 1St-Grade Load, Withdrawal Of Steel Water Pipelines, Hydraulic Testing, Diameter Of The Pipes: 400 Mm, Printing Works By Casting Bitumen Emulsion By Applying The Auto, Construction Of A Thick-Skinned Boiling-Grower-Grower-Grower-Growing Boiling Thickness Of 4 Cm Thickness, Density Of Stone Materials: 2.5-2.9 T / M3, Adding Or Exiting Or Exiting The Norm Of 0.5 Cm When The Cover Is Changed By 0.5 Cm, Construction Of The Grounds And Smoothing Layers: Sand-Gravel Mixture, From Large Sand, Adding Or Exiting Or Exiting The Norm Of 0.5 Cm In The Thickness Of The Cover 0.5 Cm (Additional 1Sm), Adding Or Exiting Or Exit To 27-06-020-3 When The Thickness Of The Cover Is 0.5 Cm, Establishment Of A Thickly Large-Grained Eu-Grainy Boiling Boiling Thickness Of 4 Cm Cover, Sand Gravel Mix
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.