Carpentry Installation Work- New Fire Brigade Schüttorf Tischler And Drywall. Drywall And Carpentry Work For New Construction Fire Brigade Buildings Schüttorf. 75M² Drywall-Up Shells For Sanitary Areas, Wall Thickness Up To 26 Cm, Wall Height Up To 3.9M 20M² Double-Standing Wall For Sanitary Area, Wall Thickness 40 Cm, Wall Height 2.65M 150M² Gk Slope Ceilings With Nonius Hangers 430M² Impregnated Gk Ceiling With Nonius Hangers 41M² Gk-Hole Plates Scatter 8/15/20 R With Nonius Fallers 2M Drywall F30 Fall, Thick 10Cm, Height 44 Cm 18X Interior Doors, Door Leaf Made Of Wooden Material, Frame Made Of Sheet Steel, Widths 1.01-1.135M, Heights 2.26-2.57M 4X Interior Doors, Plastic Door Leaf, Frame Made Of Steel Sheet, Width 1.135, Height 2.26M 1X Mobile Subject Of Individual Elements, Width 7.175, Height 3.10M
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.