Tenders Are Invited For Rewalorization Of The Blue-Green Retention Infrastructure In Kamionka, Commune Latowicz

Tender Detail

100791367
RGOŚ.271.16.2025.TN
Self-Funded
Tenders Are Invited For Rewalorization Of The Blue-Green Retention Infrastructure In Kamionka, Commune Latowicz
NCB
central europe
European Union
04-09-2025

Work Detail

1. The Subject Of The Order Is The Revaluation Of The Blue-Green Retention Infrastructure In Kamionka, Commune Latowicz At The Laws Of 201/1, 202/1, 203/1. The Population Of The Staw Should Be Ignored. The Description Of The Joint Should Be Made To The Original Parameters Of The Joint, I.E. To A Depth Of 2 M From The Level Of The Terrain In The Deepest Place (Middle Of The Pond) And About 1.5 M (At The Edge Of The Pond) With Dna Profiling. The Land From The Pond Should Be Moved And Boiled On The Slopes Within The Acts Of 201/1, Remove The Residue By Car Outside The Construction Site In Place Indicated By The Investor. Fasin Woodening The Insure Of The Pond Of The Pond To The Pond With Fascine With A Fascine With A Height Of 40-50Cm At A Length Of About 220M Laid Between Dowels 70-80 Cm, Dowel Spacing Every 0.5M. To Make Fascine, Use Willow Branches Or Branches Of Other Deciduous Trees: Oak, Hornbeam, Hazel, Alder, Birch, Beech. The Approximate Length Of The Escarpment With Fascine - 220 M. (The Shoreline Is About 310M, 90 M Of The Shoreline Will Be Strengthened With Concrete Elements). Mockery Of The Escarpment With Prefabricated Concrete Compatriots To Strengthen One Of The Slopes Indicated In The Fig. Start The Concrete Elements Of L With Concrete Valve At The Mouth Of The Water From The Pond. The Wooden Platform Should Be Placed Permanently In The Bottom Of The Pond Metal Elements That Are Attached To Wooden Platform Supports With Dimensions Of Min. 4M And Min. 2M. Prints Place In A Spacing Not More Than 2M. The Impregnated Wooden Bridge Should Be Made Above The Supports Made. Supports Should Be Made To Subsequent Expansion Of The Platform, E.G. For A T Platform. Curning Of Access To The Pond Of Length Approx. 45 Mdates To The Pond To Strengthen With A Concrete Openwork Slabs A Minimum Width Of 0.70M, Gr. Minimum 12 Cm Laid In Two Rows, Min. 0.7M, In A Typical Spacing Enabling A Ride Towards The Water Mirror With A Wheeled Vehicle, E.G. A Fire Car. Place The Plates On A Concentrated Foundation Of Broken Aggregate. Min. 25Cm And Concentrated Sand Bedding Gr. 15Cm. Fortress With Openwork Plates On The Episode Approx. 35M. In Order To Create A Slip, E.G. For Launching Boats, The Last Section Of About 10M Long Should Be Strengthened With Prefabricated Concrete Slabs -Mon, E.G. With Dimensions Of 300X150x15 Cm, Arranged In A Slope On An Area Of ​​About 10M X 3M (30M2). Removal Of Fragments Ditches, I.E. The Water Bringing Water From The Roadside Ditch To The Pond, At A Length Of About 30M Of Water Supplying The Water To The Pond At About 10M- A Ditch Draining Water From The Pond. At The Length Of About 10 Mgrunt From The Description Of The Ditch Should Be Folded Outside The Slope Of The Ditch With Spreading. The Greenery Of The Tank Should Be Planted - 8 Plantings. Protect The Planting With Three Stakes With Tape Or Mesh. The Excavation Of The Trees At The Tank Is Not The Subject Of The Contract. Disticated, Sick Trees Or Trees Preventing The Perfo

Key Value

Tender Value
Refer document

Attachment

FileName File Description
Global Tender Document Tender Notice
Attachments
Additional Details Available on Click
✓ Tendering Authority
✓ Publication Document
(Tender Document / Tender Notice )
Disclaimer :
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.
Tell us about your Product / Services,
We will Find Tenders for you

Copyright © 2025 · All Rights Reserved. Terms of Usage | Privacy Policy

For Tender Information Services Visit : TenderDetail