Tenders Are Invited For Renovation Of The Departments And Levels Of Internal Installation Of Hot Water, Cold Water, Circulation And Renovation Of Sanitary Sewage Departments In An Office Building In Olsztyn At Ul. Dworcowa 60 - Stage I
Tenders Are Invited For Renovation Of The Departments And Levels Of Internal Installation Of Hot Water, Cold Water, Circulation And Renovation Of Sanitary Sewage Departments In An Office Building In Olsztyn At Ul. Dworcowa 60 - Stage I
3 Dworcowa 60.2. The Subject Of The Contract Covers The Stage Of The 1St Technical Design, I.E. Part Of The Building To The Right Of The Staircase, As Part Of Which The Sanitary Sewage System Should Be Installed And The Installation Of Hot And Cold Water And Circulation. 3. The Scope Of Works Is Determined By The Design Documentation And The Number Of Works, Which Constitute Annex 1 To Swz.4. The Order Covers The Basic And Optional Scope. 5. Optional Scope Includes: 1) Housing With Plasterboard On Plasterboard On Single-Layer Single Metal Grates (Item 18 D.1 Of The Bill); 2) Plasters (Coat) Single-Layer Internal Gr. 3 Mm Of Putty Plaster Made By Hand On The Walls Of The G-K (Item 19 D.1 Bill Of Quantity); 3) Painting With Emulsion Paints Twice In The Internal Surfaces - Filled Gypsum Plasterboard With Priming (Item 20 D.1 Premier); 4) Housing With Plasterboard On Plasterboard On Single-Layer Single Metal Grates (Item 25 D.1 Of The Predeependent); 5) Single -Layer Plasters (Coats) Internal Gr. 3 Mm Of Putty Plaster Made By Hand On The Walls Of The G-K (Item 26 D.1 Bill Of Quantity); 6) Double Painting With Emulsion Paints Of Internal Surfaces-Plaster Plasters Of Joint Putty With Priming (Item 27 D.1 Bill Of Quantities), 7) Housing With Plasterboard Paws On Plasterboard On Single-Layer Single Metal Grates (Item 45 D.2); 8) Single -Layer Internal Plasters (Coats) 3 Mm Of Putty Plaster Made By Hand On G-K Walls (Item 46 D.2); 9) Double Painting With Emulsion Paints Of Internal Surfaces - Plaster Plaster Bladed With Priming (Item 47 D.2. Bill Of Quantity). 6. The Description Of The Subject Of The Contract And Project Documentation Specifies The Qualitative Requirements Relating To At Least The Main Elements That Make Up The Subject Of The Contract. 7. The Values Are Illustrative And Auxiliary, They Are Not Used To Calculate The Price Of The Offer, Because It Is Flat -Rate. 8. The Deadline For Execution Of The Contract: 9 Weeks From The Date Of Signing The Contract.
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.